5. Complete the Installation
Remove the Packing Material
NOTE:
Do not remove the pump hose clamps.
Cut the wire tie holding the pump to the back wall of the toilet.
Discard this wire.
If the pump has shifted during shipping or installation, reposition
it so it is not touching the back or side wall of the toilet.
Complete Connections
Connect the supply shut-off valve to the toilet supply shank.
Open the supply shut-off valve slowly to check for leaks. If the
connections have been properly assembled, a slight tightening of
the nuts should stop any leakage.
Plug the toilet electrical cord into a Class A Ground-Fault
Circuit-Interrupter (GFCI).
Adjust the tank water level to the proper marked waterline by
rotating the threaded rod clockwise to raise the water level or
counterclockwise to lower the water level.
Carefully set the cover onto the tank.
Tubing
Ferrule
Supply Shank
Seal Washer
Comp. Washer
Tubing
Ferrule
Fill Valve Nut
Supply Shut-Off Valve Connection
Coupling
Nut
Comp. Nut
Supply Shut-Off
Valve
Comp. Nut
Coupling
Nut
Float
Waterline
1021801-2-A
8
Kohler Co.