Kohler K-24619T-0 Скачать руководство пользователя страница 3

-2-

SPECIFICATIONS

Model

K-24619T-0

K-24619T-0

Voltage/Frequency

/

220V~/50Hz

220V~/50Hz

Rated Input Power

2750W

2750W

Heater Power

Fan Power
Dry Clothing Power

Ventilation Power

2731W

2731W

30W

30W

2600W(Hot)/60W(Cool)

2600W(

)/60W(

)

33W

33W

Lighting Power

Ventilation Volume

Ventilation Noise

Ingress Protection

19W 2

(108pcx

0.2W)

19W 2

(108

0.2W)

m /min

3

3.3

3.3m /min

3

43dB

43dB

IPX2 (Bathroom Heater)

IPX2 (

)

IPX4 (Remote Control)

IP20 (LED)

IPX4 (

)

IP20 (LED

)

SIMPLIFIED DIAGRAM OF THE UNIT

WIRING DIAGRAM

Hanger

BTP4*8 Tri-Self Tapping Screw

BTP4*8

BTP4*8 Tri-Self
Tapping Screw
BTP4*8

Expansion Pipe

M6 Screw Rod

M6

M6 Butterfly Nut

M6

Keel

M6 Screw Nut
M6

6 Cushion
6

6 Washer
6

Air Outlet Window

Clamp

Air Exhaust Pipe

Ventilation Outlet Assy.

MAIN

CONTROL

CIRCUIT

BOARD

ALL-POLE SWITCH (OPTIONAL)

220V
50Hz

THE RATE OF THE

POWER SWITCH

MUST NOT BE LOWER THAN 250V

20A

250V

20A

HOT MOTOR

VENT MOTOR

YELLOW/GREEN

/

HEATER 1

1

HEATER 2

2

THERMOSTAT

THERMAL FUSE

OVER CURRENT FUSE

CAPACITOR

CAPACITOR

CN4

P5

P4

P3

P2

P1

CN7

CN8

CN5

CN12

CN6

CN3

CN2

CN11

CN14

STEPPER MOTOR

STEPPER MOTOR

RED

BLUE

BLUE

BLUE

BLUE

BLUE

BLUE

RED

RED

RED

RED

BLACK

WHITE

WHITE

WHITE

BROWN

BROWN

GRAY

GRAY

PINK

PINK

YELLOW

YELLOW

ORANGE

ORANGE

LED POWER

LED

K-24619T-0

1374351-T01-A

Содержание K-24619T-0

Страница 1: ...allation and Homeowners Guide Veil Bathroom Heater S600P S600P K 24619T 0 KOHLER CHINA INVESTMENT CO LTD NO 158 JIANG CHANG SAN ROAD JING AN DISTRICT SHANGHAI PRC POST CODE 200436 158 200436 1374351 T...

Страница 2: ...7 2008 GB7000 1 GB7000 202 and GB T17743 please leave instructions for the consumer GB 4706 1 2005 GB4706 23 2007 GB 4706 27 2008 GB7000 1 GB7000 202 GB T17743 WARNING Risk of electrical shock WARNING...

Страница 3: ...rew BTP4 8 BTP4 8 Tri Self Tapping Screw BTP4 8 Expansion Pipe M6 Screw Rod M6 M6 Butterfly Nut M6 Keel M6 Screw Nut M6 6 Cushion 6 6 Washer 6 Air Outlet Window Clamp Air Exhaust Pipe Ventilation Outl...

Страница 4: ...3 10 PREPARATIONS BEFORE INSTALLATION A Preparation before the installation A 1 Open the hole of outlet window Make sure that the outlet window s position it should be lower than the outlet of the bat...

Страница 5: ...ipe 10 M6 Screw Rod M6 1285553 Lock Assy M6 Butterfly Nut M6 6 Washer 6 6Spring Washer 6 M6 Nut M6 Note Initial Length 150mm Stretch Length 2200mm 150mm 2200mm 305mm C Packing List C Remote Control 13...

Страница 6: ...have enough length for the installation The distance between the product and the air outlet window shall be 2000mm or lower Cut the screw rod M6 to suit the distance between the ceiling and the roof...

Страница 7: ...od 1 integrated ceiling integrated ceiling should be 300 300 300 450 300 600 1 Disassembly the decorated plate around the position of the product installation 3 300 300 300 450 300 600 1 300mm 300mm i...

Страница 8: ...nder by 8 BTP4 8 screw 3 M6 4 8 BTP4 8 M6 Butterfly Nut M6 6 Washer 6 6 Spring Washer 6 M6 Nut M6 M6 Nut M6 BTP4 8 Triangular Self Tapping Screw BTP4 8 8 Suspender Cement Board Ceiling Surface Install...

Страница 9: ...ors Indoors Slant Taper 1 100 1 50 BTP4 8 Triangular Self Tapping Screw BTP4 8 1 Ventilation Outlet Assy Ventilation Outlet Assy Clamp Air Exhaust Pipe 7 Install the decorated plate and adjust the nut...

Страница 10: ...the ceiling 2 B Cement Board Suspender 9 2 Fix the ventilation outlet assy to the main body using the BTP4 8 self tapping screw 3 Fix the suspension bracket to the main body using the 8 BTP4 8 self t...

Страница 11: ...Choose a mounting location for the remote holder Drilling two holes with depth larger than 45mm on the wall by drill with a diameter of 6mm in accordance with the position of screw holes on the remote...

Страница 12: ...can be heard and the LED light is on it means paring is successful B 3 LED C Button Function C DOWN Timer Down Temperature Down Brightness Down UP Timer Up Temperature ON Brightness Up HEATER Turn on...

Страница 13: ...o the default after each use HEATER the default time is 3 hours minimum time is 30 minutes and maximum time is 6 hours If press Stop when the heater is working the heater will continue to work for nex...

Страница 14: ...ersely B The remote controller is used in an inappropriate position or angle C Circuit breaker is in the Off position C No wake up C Low battery A Wait until the power is restored A Please replace the...

Страница 15: ...r supply corresponding protective measures should be taken 2 Please confirm no water penetration at the connection area of AC wire and the connection area is not easy to be affected by damp 3 The head...

Отзывы: