
Preparation (cont.)
Cut out the template where indicated for the countertop opening.
Cut along the inside of the cutting line.
Position the template on the countertop to ensure clearance
between the lavatory, faucet, and backsplash.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Kohler Co.
3
1018888-2-D
Содержание K-2075
Страница 13: ...1018888 2 D ...
Страница 14: ...1018888 2 D ...
Страница 15: ...1018888 2 D ...
Страница 16: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 México 001 877 680 1310 kohler com 2005 Kohler Co 1018888 2 D ...