1. Prepare the Site
Rough-in the Plumbing
NOTICE:
For exterior wall installations, ensure proper wall
insulation to prevent frozen pipes.
Attach a 2x4 brace between two studs to support the supply lines.
The brace should be positioned so the face of the 1/2-14 NPT
supply elbows will be recessed 1/8
″
(3 mm) to 1/2
″
(1.3 cm)
within the finished wall.
NOTICE:
Tile or stone covered walls may require an extension of
the supply line.
Position the supply lines 5-7/8
″
(14.9 cm) between the centerlines,
then attach a brass elbow to each supply line.
Verify the elbows are level with one another and the opened end
faces are recessed 1/8
″
(3 mm) to 1/2
″
(1.3 cm) behind the
planned finished wall surface.
Secure the elbows and supply lines to the 2x4.
Apply sealant tape to each pipe nipple.
Escutcheon
Supply Lines
Pipe Nipple
Apply sealant tape.
2x4
5-7/8"
(14.9 cm)
1/8" (3 mm) -
1/2" (1.3 cm)
Stud
2x4
Brace
Finished
Wall
Elbow
Kohler Co.
5
1084859-2-C