
Kohler Co.
3
1049369-X2-A
Turn off the water supply.
Flush the toilet, then sponge out all remaining water from the tank.
Disconnect the supply shut-off valve (if present), and remove the old
bowl and tank.
1. Remove the Existing Toilet
2. Define the Position of Connector
Place the connector onto the bowl, position between outlet and waste
pipe.
CAUTION: Risk of hazardous gases.
If the new toilet is not
installed immediately, temporarily stuff a rag in the closet flange.
For this model, there are two types of connector. You can choose one of
the above pictures which is most suitable to your local plumbing and
building codes.
18 cm.
30.5 cm.
Install to Wall
Install to Floor
Содержание K-17641
Страница 9: ...K 17641 Kohler Co 1 1049369 X2 A...
Страница 10: ...1049369 X2 A 2 Kohler Co 1 2 2...
Страница 11: ...Kohler Co 3 1049369 X2 A 3...
Страница 12: ...1049369 X2 A 4 Kohler Co 4...
Страница 13: ...5 Kohler Co 5 1049369 X2 A...
Страница 14: ...1049369 X2 A 6 Kohler Co 6...
Страница 15: ...7 Kohler Co 7 1049369 X2 A...