1114993-X2-A 2
Kohler Co.
Before You Begin
This document contains the lastest product information available at time of
publication. Kohler reserves the right to make changes in product characteristics,
packaging or availability at anytime without notice.
The product pictured in the installation steps may differ from the model being
installed.
IMPORTANT NOTICE TO INSTALLERS
Please leave these instructions for the consumer. They contain important
information.
•
Flush the water supply pipes thoroughly to remove debris.
•
Inspect the supply tubing for damage. Replace as neccessary.
•
If possible, install this faucet before installing the tub.
•
The diameter of mounting hole for valve kit not less than 39 mm. and mounting
hole for faucet not less than 26 mm.
•
The highest working pressure for faucet is 0.4Mpa. (4 bars). If it exceeds
0.4Mps (4 bars), a pressure reducer is needs.
ก่อนเริ่มการติดตั้ง
ข้อมูลในคู่มือนี้มาจากข้อมูลผลิตภัณฑ์ล่าสุดที่มีอยู่ในช่วงเวลาการจัดพิมพ์ บริษัทฯ ขอสงวนสิทธิ์
ในการเปลี่ยนแปลงข้อมูลผลิตภัณฑ์ บรรจุภัณฑ์ที่มีอยู่โดยมิต้องแจ้งให้ทราบล่วงหน้า
รูปภาพของผลิตภัณฑ์ที่แสดงขั้นตอนการติดตั้งอาจแตกต่างจาก รุ่นที่ดำาเนินการติดตั้ง
ข้อสำาคัญสำาหรับผู้ติดตั้ง คู่มือนี้มีข้อมูลสำาคัญ โปรดมอบเอกสารให้กับเจ้าของผลิตภัณฑ์
•
ทำาความสะอาดท่อนำ้าดี โดยขจัดเศษสิ่งสกปรกต่างๆ
•
ปิดวาล์วทางนำ้าเข้า
•
ควรทำาการติดตั้งก๊อกนำ้าก่อนการติดตั้งอ่างอาบนำ้า
•
ขนาดรูเจาะวาล์วนำ้าไม่ควรน้อยกว่า 39 มม. และขนาดรูก๊อก ไม่น้อยกว่า 26 มม.
•
ค่าแรงดันนำ้าสูงสุดไม่เกิน 0.4 Mpa. (4 บาร์) หากค่าแรงดันมากกว่า 0.4 Mpa. (4 บาร์)
ควรทำาการปรับให้ค่าแรงดันลดลง