Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don’t
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Tools and Materials
Before You Begin
Please read all instructions before you begin.
Observe all local plumbing and building codes.
Shut off the main water supply.
Provide an access panel for all installations.
Carefully inspect waste and supply tubing for any sign of
damage. Replace if needed.
NOTE:
Plumbing codes may require a vacuum breaker be installed
in-line to handshowers. Please consult with local plumbing codes. If
a vacuum breaker is required, ensure that it is not installed between
the handshower high pressure and interlock hoses.
Kohler Co. reserves the right to make revisions in the design of
products without notice, as specified in the Price Book.
Drill
Tape Measure
Adjustable Wrench
1-1/4" Drill Bit
1041355-2-C
2
Kohler Co.
Содержание K-10573
Страница 13: ...1041355 2 C ...
Страница 14: ...1041355 2 C ...
Страница 15: ...1041355 2 C ...
Страница 16: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 México 001 877 680 1310 kohler com 2005 Kohler Co 1041355 2 C ...