background image

1085772-2-AA/Rev00

螺纹处须缠绕足

以密

的密

封胶带

适合

的密

封胶

将冷热

水管

2

管道

配件

1

持两进

水管

相互

平行且高度

Supply enough tape or sealant on bottom

threads. Connect G1/2" hot and cold riser

tubes(2) to supply fittings(1). Ensure that

riser tubes are parallel to each other and

at the same height.

过旋转托架

7

调节连接组件

心距

使其与

管中

心距

注意两边

螺纹

Rotating brackets(7), adjust the

center-to-center distance of brackets

according to that of riser tubers. Ensure

threads are not exposed.

带小孔

水管安装

在左侧

小孔朝下

(Hot)

(Cold)

2

The hot riser tube with small hole

should be installed on the left and keep the

hole downwards.

Slide escutcheons(3) onto the pipes. Push

it against the fininshed floor. Secure it with

screws(4) by hex wrench(5).

饰盖

3

套入冷热

水管

2

,

推直至与

修好

接触

角扳手

5

锁紧螺钉

4

定装

1

根据

浴缸

龙头

定安装

使

安装

G1/2"

螺纹

管道

配件

1

应已

心距

204mm~205mm

出装

修好

Determine a suitable location according to

the bath and faucet purchased.To perform

installation, installer must provide G1/2"

female supply fittings(1), space

204mm~205mm apart, perpendicular and

not extending to the finished floor.

安装

检查

螺钉

4

出装

饰盖

3

螺钉

6

托架

7

出用

扳手

将其

退

防止划伤

水管

Ensure the screws(4) are not

beyond internal surface of escutcheons(3)

and the screws(6) are not beyond internal

surface of brackets(7) before installation.

Or adjust it by hex wrench(5). In order to

avoid damage the riser tube surface.

5

4

3

6

7

根据浴缸

与冷热

水管

选择

10

加长

11

冤袁

T

接头

8

调节

According to the distance between bath

drain and riser tubes, select fastener rod(10)

or extension fastener rod(11). Thread it into

tee(8), and adjust to suitable length.

9

10

11

5

8

Содержание Finial 607T

Страница 1: ...ake changes in product characteristics packaging or availability at any time without notice Please leave these instructions for the consumer They contain important information 1 Flush the water supply pipes thoroughly to remove debris 中国北京市密云县果园西路 号 邮编院 北京科勒有限公司 57 G1 2 G1 2 204 205 G1 2 G1 2 57 262 1 8 27 NPSM A向渊A View冤 A 1 8 27 NPSM 2 该支架只具有连接功能袁它必须与具有冷热控 制开关的与之相配合的科勒浴缸龙头配合使用遥 2 The riser tubes...

Страница 2: ...冷热水管渊2冤 下 推直至与装修好的地面接触遥 用六 角扳手渊5冤锁紧螺钉渊4冤以固定装饰 盖遥 1 根据选配的浴缸和龙头确定安装位 置遥 为使安装顺利袁G1 2 内螺纹 管道配件渊1冤应已装好袁中心距 204mm 205mm袁垂直并不高出装 修好的地面遥 Determine a suitable location according to the bath and faucet purchased To perform installation installer must provide G1 2 female supply fittings 1 space 204mm 205mm apart perpendicular and not extending to the finished floor 安装前袁检查螺钉渊4冤是否露 出装饰盖渊3冤内表面袁螺钉渊6冤是否 露出托架渊7冤内表...

Страница 3: ... Many cleaners may contain chemicals such as ammonia chlorine toilet cleaner etc which could adversely affect the finish and are not recommended for cleaning 堵住两个管段袁打开主供水源袁检查 并修理有漏水的接口遥 关闭主供水 源遥 Install plugs on hot and cold pipes Turn on the main water supply Check for leaks Repair as required Turn off the main water supply 将调节好的连接组件套入冷热水 管遥 根据浴缸落水安装说明选择适 当的安装高度袁连接浴缸落水袁用六 角扳手渊5冤锁紧固定螺钉渊6尧9冤遥 Slide...

Страница 4: ...有限公司 Hot Riser Tube 1088466 热水管 2mm Hex Wrench 1046290 2毫米六角扳手 Bracket 42238 托架 Extension Fastener Rod 42237 加长连杆 22911 Escutcheon 装饰盖 Screw 1041023 螺钉 Cold Riser Tube 1082905 冷水管 Fastener Rod 1001117 连杆 Screw 1041023 螺钉 1093449 Tee Kit T型接头组件 ...

Отзывы: