NOTE:

Damage occurred during transport or

installation shall not be covered by warranty.

SITE REQUIREMENTS

A.

A.

Preparation

Check the flooring under the bath, and make repairs as
needed. Make sure the

is level. It is strongly

recommended to prepare waterproof layer for the
subfloor beforehand.

Subfloor

subfloor

D.

D. Clearance Requirements

Check the roughing-in and room dimensions to provide
adequate available space for the bath unit.

·

·

·

·

·

·

·

·

·

·

Adjustable pipe
wrench
Rule
Level
Safety shoes
Safety glasses
Square
Screwdriver
Pliers
Utility knife
Adjustable wrench

·
·
·
·
·

·

·

Plumbers putty

Wall coverings(as necessary)

Silicone sealant

Gypsum cement(optional)

Construction adhesive
(optional)

Protective covering for
bathtub

Nails

B. Materials Required

A. Tools Required

·

·

·

·

·

·

·

·

·

·

·
·
·
·
·

·

·

(

)

(

)

(

)

B.

A.

INSTALLATION REQUIREMENTS

D. New or Replacement Installation

Requirements

This bath can be installed in new or existing bathrooms.
For replacement: Remove the old bath, and remove
enough old wall material and floor covering from the
area to allow for installation. Remove any old plumbing
that does not confo m to the rough-in requirements.
For new installation: Position the plumbing according to
the rough-in dimensions. Cap the suppliers, and check
for leaks.

r

D.

C. Installation Note:

C.

:

Read the entire installation instructions included with
fixture before beginning the installation.

If installing a rim-mounted faucet, make sure there is no
interference with drain overflow before drilling any
holes.

1119528-T01-C

Содержание EVOK K-18343T

Страница 1: ...bility of the installer to ensure that the waste is made watertight by means of silicone sealant or caulking compound The bath can be installed after the decoration of the bathroom walls is finished However bath drain and water pipe shall be pre arranged please leave these instructions for the consumer IMPORTANT NOTE BEFORE YOU BEGIN A A Summary Of Key Requirements Observe all local plumbing codes...

Страница 2: ... optional Construction adhesive optional Protective covering for bathtub Nails B Materials Required A Tools Required B A INSTALLATION REQUIREMENTS D New or Replacement Installation Requirements This bath can be installed in new or existing bathrooms For replacement Remove the old bath and remove enough old wall material and floor covering from the area to allow for installation Remove any old plum...

Страница 3: ... the height marked in the Roughing In IMPORTANT A 1 2 Place the base on the floor 2 3 Fix the base on the floor with silicone sealant 3 4 Apply silicone sealant around the tail end of the drain hose Connect the drain hose with floor drain Make sure the drain hose protrudes from the floor for a certain length to facilitate future bath removal 4 BEFORE INSTALLATION A A Protect the Bath Unit Cover th...

Страница 4: ... the floor 6 4 B Plumbing Installation The drain has been installed onto the bath before it leaves factory Fill the bath with water before the bath is securely positioned so as to check the connections for leaks Damage caused by negligence is not covered by warranty Be careful not to damage the bottom of the bath and the subfloor Note B Guide Pin Guide Bush Base 1119528 T01 C ...

Страница 5: ...e surface Wipe out the bath after each use to prevent a build up of soap and scum If the acrylic surface becomes dull an automotive type rubbing compound may be used on the unit followed by an application of paste wax We recommend Rubbing compound mequiars mirror glaze 28 metal polish import product reen oil G IMPORTANT CONSUMER INFORMATION 2 When installing the freestanding bath please first appl...

Отзывы: