Page 1
Before installing the bath please read these instructions carefully to familiarise yourself with
the required tools, materials and installation sequences. This will help you avoid costly
mistakes. The installation documents included assume that walls are plumb and floors are
level. Slight adjustments to the installation procedure may be required for out-of-square
surfaces.
In addition to proper installation, read all operating and safety instructions and refer to the
Homeowner’s Guide for important care and cleaning information. Ensure that all local
building and plumbing codes are observed.
These instructions contain important care, cleaning and warranty information. Please leave
these instructions for the consumer after installation.
INSTALLATION INSTRUCTIONS
FREE STANDING BATHS
BEFORE YOU BEGIN
TOOLS AND MATERIALS REQUIRED
ENGLEFIELD
INSTALLATION
Note:
Instructions, drawings, and diagrams contained in this manual present information available at the
time of printing. Although every attempt has been made to keep them up-to-date, Englefield reserves the
right to implement product changes without further notice.
1) Unpack the bath and check for any transit damage prior to installation.
2) Postition the bath in the desired location in the bathroom.
3) Check that the plumbing can be connected to the bath when in the desired location and
that the positioning of the bath does not interfere with other bathroom fixtures.
Timber blocks
4) Install the waste system (not supplied) in accordance with the manufacturers instructions.
Please adhere to the relevant sections of NZS 3500 plumbing standard.