
TP-6810 7/16
21
Section 2 Generator Set Operation
12. Set the exercise frequency (weekly or every two
weeks). Weekly exercises are recommended.
13. Press the down arrow button to step to the Return
menu. Press the Select button to return to the main
menu.
14. Check that the AUTO LED is lit. The generator set
must be in automatic mode for the exercise to run
as scheduled.
After a scheduled exercise run, the next exercise time
and date will be updated automatically based on the
Exercise Frequency setting.
Other transfer switches:
For a loaded exercise with a
transfer switch other than a Kohler
r
Model RXT,
program the exercise at the transfer switch controller.
Refer to the transfer switch operation manual for
instructions.
Overview ---->
1.2 h
Engine
---->
Metering
tp6810
Generator---->
Metering
Genset
---->
Information
Genset
---->
Run Time
Date
---->
and Time
ATS
---->
Configuration
Genset
---->
System
Event Log---->
Load
---->
Control
PIM
---->
Status
Network ---->
Information
Status
Displays
ATS
---->
Status
Figure 2-2
RDC2 Main Menu
Содержание 38RCL
Страница 12: ...TP 6810 7 16 12 Service Assistance Notes...
Страница 28: ...TP 6810 7 16 28 Section 2 Generator Set Operation Notes...
Страница 66: ...TP 6810 7 16 66 Section 5 Troubleshooting Notes...
Страница 69: ...TP 6810 7 16 69 Notes...
Страница 70: ...TP 6810 7 16 70 Notes...
Страница 71: ......