background image

2

c. Assemble rod and ball joint linkage as shown

in installation drawing. Attach linkage to
governor throttle lever with hardware
indicated in Figure 1 or Figure 2. Do not
connect linkage to mounting bracket until
next step.

d. To correctly set throttle rod length, rotate

throttle lever clockwise until lever stops
against the fast idle adjusting screw. Rotate
throttle lever an additional 10 degrees
clockwise then attach ball joint on free end
of rod to mounting bracket. When properly
adjusted, the spring on the throttle lever will
be slightly extended. See Figure 3.

3.2

125---180ROZJ Models

a. Remove hardware securing throttle lever to

governor shaft. Remove and discard throttle
lever and mounting screws.

b. Attach throttle bracket (275546) to governor

shaft with screws and washers as shown in
Figures 4 and 5. Torque to 28 ft. lbs. (40 Nm).
When installed, the throttle bracket should
contact the governor stop screw to hold the
throttle in the full---open position against the
idle speed adjusting screw.

DO NOT

CHANGE POSITION OF IDLE SPEED
ADJUSTING SCREW.

4. Reconnect

generator

starting

battery,

negative lead last.

5. Start generator set. Using a tachometer or

frequency meter on controller (if equipped),
check engine full load speed. Engine speed
should be 1800 rpm at 60 Hz and 1500 at 50
Hz operation. If engine speed is incorrect,
refer to the generator service manual for
governor adjustment procedure.

Kit No. 275548 50---60ROZJ

Kit No. 275547 20---40ROZJ

Figure 1. Throttle Repair Kits for 20---60ROZJ

Отзывы: