19
5.3 MACHINE BREAK-IN
Although there are no operational restrictions on the
3RUWDEOH*HQHUDWRUZKHQXVHGIRUWKHÀUVWWLPHLWLV
recommended that the following mechanical items
be checked:
A.
After operating for 1 hour:
5HWRUTXHDOOIDVWHQHUVDQGKDUGZDUH
2.
Check condition of all electrical connec-
tions.
&KHFNÁXLGOHYHOV7RSXSDVUHTXLUHG
B.
After operating for 10 hours:
5HSHDWVWHSVWKURXJKOLVWHGDERYH
6HFWLRQ$
2.
Change engine oil.
3.
Go to the normal servicing and mainte-
QDQFHVFKHGXOHDVGHÀQHGLQWKH0DLQWH
-
nance Section.
5.4 PRE-OPERATION CHECKLIST
(IÀFLHQWDQGVDIHRSHUDWLRQRIWKH.RGLDN3RUWDEOH
Generator requires that each operator reads and
understands the using procedures and all related
safety precautions outlined in this section. A pre-
operation checklist is provided for the operator. It is
important for both the personal safety and maintain-
ing good mechanical condition that this checklist is
followed.
Before operating Portable Generator and each time
thereafter, the following areas should be checked
off:
&KHFNHQJLQHÁXLGOHYHOV7RSXSDVUHTXLUHG
&KHFNDOOHOHFWULFDOFRQQHFWLRQV5HSODFHUH
-
pair or clean as required.
3.
Make sure that all guards and shields are in
place, secured and functioning as designed.