6. Mechanical Connection
Before installation:
Make sure that the actual flow rate corresponds with the measuring range of
the meter.
Make sure that the approved maximum operating pressure and operating
temperature of the meter are not exceeded.
Remove all transport restraints and ensure that there are no pieces of
packaging left in the meter.
Make sure that there are no welding beads, metal filings, or other pollutants, in
the piping. We strongly recommend you to connect a suitable filter in series
(filtration
30
m
).
Installation:
The OVZ may be installed in any position; the liquid may flow in both
directions.
Inlet and outlet pipes are not required.
The connection threads may be sealed with sealing tape etc.
When installing the meters, make sure that the connection threads are not
subjected to large pressure or tensile loads. We recommend that you
mechanically secure the inlet and outlet line approximately 50 mm from the
connections.
If possible, you should check that the joint connections are sealed and leak-
free after mechanical installation.