![KOBE IN2630SQB-700-2 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/kobe/in2630sqb-700-2/in2630sqb-700-2_installation-instructions-and-operation-manual_1981928011.webp)
8
22. The oil tunnel is already installed into recess support near
rear of hood. Refer to Figure 12.
23. Install baffle filters. Angle baffle filter toward back of hood
①
.
Push baffle filter up until almost level
②
.
Slide forward
into recess behind the front of hood
③
. Lower baffle filter
④
. Slide back until it fits into resting position
⑤
.
Refer to
Figure 13.
Figure 12
Figure 13
Final Assembly
Содержание IN2630SQB-700-2
Страница 18: ...15 MODEL No IN2630SQB 700 2...
Страница 19: ...16 CIRCUIT DIAGRAM MODEL NO IN2630SQB 700 2...