![KOBE CH7930SQ Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/kobe/ch7930sq/ch7930sq_installation-instructions-and-operation-manual_1981882012.webp)
10
STAND ALONE INSTALLATION – TOP VENT
***This installation only applied with the purchase of an optional duct cover (Model No. CH1120DC).
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13.
- A straight, short venting run will allow the hood to perform more efficiently.
- Try to avoid as many transitions, elbows, and long run as possible. This may reduce
the performance of the hood.
- Use duct tape to seal the joints between pipe sections.
- If necessary, prepare back wall frame with cross framing lumber for secure installation.
- Using references on Table 2 and measurements on page 21-22, decide the level of the
lumber. Refer to Figure 14.
Hood Preparation before Installation
- Temporarily wire the hood to test for proper operation before installing.
- Peel protective film off the hood and the duct cover (if any).
- Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15.
Figure 13 Figure 14
Figure 15
6” Round Vent 7” Round Vent 3-1/4” x 10” Vent
Содержание CH7930SQ
Страница 24: ...22 Hood Mounting Bracket Duct Cover Mounting Bracket ...
Страница 26: ...24 MODEL NO CH7930SQ CH7936SQ ...
Страница 27: ...25 MODEL NO CH7942SQ CH7948SQ ...
Страница 28: ...26 CIRCUIT DIAGRAM MODEL NO CH7930SQ CH7936SQ ...
Страница 29: ...27 MODEL NO CH7942SQ CH7948SQ ...