18 www.grupotemper.com
KMDS01
AUTORANGING MULTIMETER
REPLACING THE FUSES
WARNING
: To avoid electric shock, disconnect the test leads
from any source of voltage before removing the fuse door.
1. Disconnect the test leads from the meter and any item under
test.
2. Open the fuse door by loosening the screw on the door using a
Phillips head screwdriver.
3. Remove the old fuse from its holder by gently pulling it out.
3.
Install the new fuse into the holder.
4.
Always use a fuse of the proper size and value (0.2A/250V
fast blow for the 200mA range),
5.
Put the fuse door back in place. Insert the screw and tighten it
securely.
WARNING
: To avoid electric shock, do not operate your meter
until the fuse door is in place and fastened securely.