ASSEMBLY INSTRUCTIONS
8
Hardware Used
FF
x 4
M8 Nut
3. If you plan to stack the top chest (A)
onto the bottom cabinet (B), please
follow the below step. Otherwise, forget
this step. Unload the two bottom
drawers from the top chest (A) and the
big drawer from the bottom cabinet (B)
using the method on Operating
Instructions (Page 9). Insert
M8 x 20 mm bolts (BB) from the top of
the bottom cabinet (B) into the bottom
of the top chest (A) and tight with M8
Nut (FF). Install the 3 unloaded drawers
back using the method on Operation
Instructions (Page 9).
BB
x 4
M8 x 20 mm Bolt
B
BB
FF
A
3