
ASSEMBLY INSTRUCTIONS
7
5. Insert the shelf pads (G) into the middle of
steel tubes.
Note: Wire grid with overhang side should be
faced down.
6. Hold foldable dual wire shelves (D) at an
angle, unfold and place them onto the
previously assembled long beams. Insert
the L-type pins (E) into the locking pin
holes at both ends of every long beam
using a downward motion.
5
E
D
G
G
6