![Knightsbridge EMLREC Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/knightsbridge/emlrec/emlrec_installation-and-maintenance-manual_1980503003.webp)
• Feed the mains cable through the cable entry hole in the top cover
• Connect the mains cable into the push-fit terminal block ensuring correct polarity is observed. Live (brown),
Neutral (blue)
• For non-maintained operation, remove the 2-pin connector from the circuit board (see Fig. 3). For
maintained operation, leave it in place. This fitting cannot be connected for switched maintained operation
• Remove the two screws on top of the fitting (see Fig. 2) and remove the top cover
Fig. 2
Remove screws
Cable entry point
Fig. 3
•
Connect the battery lead to the battery connector on the PCB (see Fig. 3)
•
Refit the top cover and install into ceiling aperture
•
Switch on and check for correct operation, ensuring the green indicator LED is illuminated
•
On commissioning the installation, a minimum charge period of 24 hours is recommended before
carrying out an emergency duration test.
•
The test button on the side of the luminaire can be used to simulate a power failure, to test the lamp
and battery operation. This can be used to carry out monthly functional testing (see below). The
fitting will switch into battery mode while the test button is held in
WARNING
This product must be disconnected from the circuit if subjected to any high voltage or insulation resistance
testing. Irreparable damage will occur if this instruction is not followed
GENERAL
This product should be recycled in the correct manner when it reaches the end of its life. Check local authorities
for where facilities exist
If the batteries have been left in a discharged state for an extended period, we recommend that one or more
charge and discharge cycles are completed which should help to restore the battery capacity
The batteries in this luminaire are Nickel Cadmium and must be disposed of correctly. Please contact local
authorities for the disposal of this toxic waste
Clean with a soft dry cloth only, do not use aggressive cleaning products or solvents which may damage the
product
WARRANTY
This product has a warranty of 3 years (excluding battery) from date of purchase. Failure to install this product in
accordance with the current edition of the IEE Wiring Regulations, improper use, or removal of the batch codes
will invalidate the warranty. If this product should fail within its warranty period it should be returned to the place
of purchase for a free of charge replacement. ML Accessories does not accept responsibility for any installation
costs associated with the replacement product. Your statutory rights are not affected. ML Accessories reserve the
right to alter product specification without prior notice.
TESTING FOR EMERGENCY LUMINAIRES
Recommended routine test procedure in accordance with BS5266
•
Daily check
– check LED charge indicator is illuminated
•
Monthly functional test
– simulate a mains supply failure for approx. 30 seconds by operation of key
switch or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge
indicator is illuminated
• Connect the battery lead to the battery connector on the PCB (see Fig. 3)
• Refit the top cover and install into ceiling aperture
• Switch on and check for correct operation, ensuring the green indicator LED is illuminated
• On commissioning the installation, a minimum charge period of 24 hours is recommended before carrying
out an emergency duration test
Fig. 3
Connect battery lead
Remove 2-pin connector
non-maintained operation
Содержание EMLREC
Страница 1: ...INSTALLATION MAINTENANCE MANUAL EMLREC ...