• Feed the mains cable through the cable entry hole in the top cover
• Connect the mains cable into the push-fit terminal block ensuring correct polarity is observed. Live (brown), 

Neutral (blue)

• For non-maintained operation, remove the 2-pin connector from the circuit board (see Fig. 3). For 

maintained operation, leave it in place. This fitting cannot be connected for switched maintained operation

• Remove the two screws on top of the fitting (see Fig. 2) and remove the top cover

Fig. 2

Remove screws

Cable entry point

          

 

Fig. 3 

  Connect the battery lead to the battery connector on the PCB (see Fig. 3) 

  Refit the top cover and install into ceiling aperture 

  Switch on and check for correct operation, ensuring the green indicator LED is illuminated 

  On commissioning the installation, a minimum charge period of 24 hours is recommended before 

carrying out an emergency duration test. 

  The test button on the side of the luminaire can be used to simulate a power failure, to test the lamp 

and battery operation. This can be used to carry out monthly functional testing (see below). The 

fitting will switch into battery mode while the test button is held in 

WARNING 

This product must be disconnected from the circuit if subjected to any high voltage or insulation resistance 

testing. Irreparable damage will occur if this instruction is not followed 

GENERAL 

This product should be recycled in the correct manner when it reaches the end of its life. Check local authorities 

for where facilities exist 

If the batteries have been left in a discharged state for an extended period, we recommend that one or more 

charge and discharge cycles are completed which should help to restore the battery capacity 

The batteries in this luminaire are Nickel Cadmium and must be disposed of correctly. Please contact local 

authorities for the disposal of this toxic waste 

Clean with a soft dry cloth only, do not use aggressive cleaning products or solvents which may damage the 

product 

WARRANTY

 

This product has a warranty of 3 years (excluding battery) from date of purchase. Failure to install this product in 

accordance with the current edition of the IEE Wiring Regulations, improper use, or removal of the batch codes 

will invalidate the warranty. If this product should fail within its warranty period it should be returned to the place 

of purchase for a free of charge replacement. ML Accessories does not accept responsibility for any installation 

costs associated with the replacement product. Your statutory rights are not affected. ML Accessories reserve the 

right to alter product specification without prior notice. 

TESTING FOR EMERGENCY LUMINAIRES 

Recommended routine test procedure in accordance with BS5266 

 

Daily check

 – check LED charge indicator is illuminated 

 

Monthly functional test

 – simulate a mains supply failure for approx. 30 seconds by operation of key 

switch or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge 

indicator is illuminated 

• Connect the battery lead to the battery connector on the PCB (see Fig. 3)
• Refit the top cover and install into ceiling aperture
• Switch on and check for correct operation, ensuring the green indicator LED is illuminated
• On commissioning the installation, a minimum charge period of 24 hours is recommended before carrying 

out an emergency duration test

Fig. 3

Connect battery lead

Remove 2-pin connector 

non-maintained operation

Содержание EMLREC

Страница 1: ...INSTALLATION MAINTENANCE MANUAL EMLREC ...

Страница 2: ... isolate mains prior to installation or maintenance Check the total load on the circuit including when this luminaire is fitted does not exceed the rating of the circuit cable fuse or circuit breaker Please note the IP Ingress Protection rating of this luminaire when deciding the location for installation This product is Class II double insulated This product is IP20 rated SAFETY INSTALLATION Prov...

Страница 3: ... ensuring the green indicator LED is illuminated On commissioning the installation a minimum charge period of 24 hours is recommended before carrying out an emergency duration test The test button on the side of the luminaire can be used to simulate a power failure to test the lamp and battery operation This can be used to carry out monthly functional testing see below The fitting will switch into...

Страница 4: ...ght source of this luminaire is not replaceable when the light source reaches its end of life the whole luminaire should be replaced Clean with a soft dry cloth only do not use aggressive cleaning products or solvents which may damage the product This product is non dimmable This product should be recycled in the correct manner when it reaches the end of its life Check local authorities for where ...

Страница 5: ...ds by operation of key switch or switching off circuit breaker Ensure normal supply is restored after test and ensure charge indicator is illuminated Annual three hour duration test simulate a mains supply failure for a three hour continuous test by operation of key switch or switching off circuit breaker Ensure normal supply is restored after test and ensure charge indicator is illuminated If the...

Страница 6: ...AR THIRD YEAR FOURTH YEAR FIFTH YEAR SIGNED DATE SIGNED DATE SIGNED DATE SIGNED DATE SIGNED DATE 1 FUNCTIONAL 2 FUNCTIONAL 3 FUNCTIONAL 4 FUNCTIONAL 5 FUNCTIONAL 6 FUNCTIONAL 7 FUNCTIONAL 8 FUNCTIONAL 9 FUNCTIONAL 10 FUNCTIONAL 11 FUNCTIONAL 12 3 HOUR Installed by Installation date Contact number ...

Отзывы: