background image

Page 3

Assembly Guide

Team Table

Step 5 

Ensure the worksurface is centered over the frame. Pre-drill 
holes in the worksurface. Fully tighten all 10Gx20mm self 
tapping screws through each leg and rail spacer bracket into 
the worksurface.

Completed

Step 6 

Conceal any power box cables using the magnetic leg cable 
covers.

Optional 

Loosely connect the M8x20mm dome head bolt and slot nut 
through the metal rail spacer bracket. Slide brackets onto rails, 
space evenly and fully tighten in place. 

Rails 800mm or longer 

require 1 bracket, 1600mm or longer rails require 2 brackets.

Please Note: 

Table top may have pre-drilled holes on the underside, these holes may not 

ailgn to your specific frame. If this is the case, the frame will need to be aligned to the top 

and new holes drilled separately and screws provided used.

Отзывы: