30
5. Installation
5.1 Selection of qualified personnel
It is advisable to have trained KNECHT personnel perform the installation
work on the grinding machine.
We assume no liability for damage caused by improper installation.
CAUTION
5.2 Installation site
When determining the installation site, bear in mind the space requirement for installation,
maintenance and repair work on the grinding machine (see Chapter 3.2).
5.3 Supply connections
The grinding machine can be connected upon delivery using the corresponding plug (32 A) for
the power supply and a compressed air hose (5 m).
Confirm that the machine is correctly connected to the current supply.
CAUTION
5.4 Settings
The various components and the electrics are adjusted by KNECHT Maschinenbau GmbH before
delivery.
ATTENTION
Unauthorised changes to set values are not
permitted and may damage the grinding
machine.
Control parameters may only be changed by
accordingly qualified personnel. This person
must be familiar with the machine functions
and the meaning of the parameters. Other-
wise, damage to the machine is likely to
occur.