Installation 11
AZURA® Conductivity Monitor CM 2.1S Instructions, V6710
4.1.2 Unpacking
There is no noticeable damage to the packaging.
Utility knife
Process
1.
Set-up the package in such a way that you can read the label. Using
the utility knife, cut the adhesive tape and open the packaging.
2.
Remove the foam insert. Take out the accessories kit and the
manual.
3.
Open the accessories kit. Check the scope of delivery. In case any
parts are missing, contact the technical support.
4.
Clasp the device at its side panels and lift it out of the packaging.
5.
Remove the foam inserts from the device.
6.
Check the device for signs of damage that occurred during trans-
port. In case you notice any damage, contact the technical support.
7.
Set-up the device in its location.
8.
Remove the protective foil.
Carefully store all packaging material.
4.1.3 Integration into the FPLC/HPLC System
Integrate the conductivity monitor into the FPLC/HPLC system. In case
you want to use the conductivity monitor together with an UV detector
and a pH monitor in one system, you should position the monitor behind
the UV detector and before the pH flow cell, as the pH monitor has a
maximum pressure stabil ity of 5 bar.
Legend:
1
Solvent bottles
2
Solvent tray
3
Injection valve
4
Binary pump
5
Column
6
Flow cell of UV detector
7
CM flow cell
8
Conductivity monitor
AZURA® CM 2.1S
9
pH flow cell
bl
pH electrode
bm
AZURA® Organizer
bn
Waste bottle
Fig. 3:
Example: Connetion of a binary FPLC gradient system with a
UV detector
Prerequisites
Tools
Next steps
2
3
4
5
6
7
9
bm
bn
bl
8
1