background image

template

Parts Included

A.  Frame (1)
B.  Pull-Out Shelves (2)
C.  Adjustable Side Baskets (4)
D.  Installation Template (1)
E.  #8 x 1/2" Bearing Mounting Screws (4)
F.  #6 x 1/2" Upper Mounting Screws (4)

KIDNEY-SHAPED

LAZY SUSAN DRAWER SYSTEM

Inspect all parts and read all instructions prior to beginning assembly and installation.

310104-C_0114

2700 Oak Industrial Drive NE , Grand Rapids, MI  49505  USA 

800.253.1561  •  616.459.3311  •  www.kv.com

©2014 Knape & Vogt. All rights reserved. Made in USA. Knape & Vogt

®

 reserves the right to change specifications without notice.

Tools Required

•  Phillips head screwdriver
•  Drill with 1/16" (1.5mm) bit for

  drilling pilot holes
• Pencil

SDS-KD-28-FNW

Product Assemblies

1. 

Use the installation template to locate, mark and drill the necessary top and  

 

bottom mounting holes.

 NOTE:

 The installation template is designed for marking the top AND bottom

 

of the frame. 

(A)

2. 

Place the frame into the cabinet. Align the bearing mounting holes to the 

 

pre-drilled mounting holes. Secure with fasteners. 

(E)

 Secure upper mounting  

 

bracket with fasterners. 

(F)

 

 NOTE:

 It may be necessary to rotate the frame in order to locate the pre-drilled  

 

mounting holes.

3. 

Test the unit for proper rotation. The unit should rotate evenly in both directions.  

 

If the rotation is not even in both directions, then the bottom bearing is secured  

 

in the incorrect position. To correct, remove the fasteners from the bottom bearing  

 

only and rotate the bearing by one hole in whichever direction is necessary for  

 

even rotation. Reinstall fasteners.

4. 

Install the two pull-out shelves. To install the shelves, place shelf on slides and  

 

push back. The shelf will be secure by the two pins that are located on the top of  

 

the slides and the release levers will snap into the slides. Reinstall and position  

 

the four adjustable side baskets for intended use.

D

E

F

B

C

A

Отзывы: