background image

Tube I leave 

at least 5cm

inside Tube B

Press to lock 

extendable

Tube I

Tube A & D 

leave at least 

5cm inside

Tube E

Clockwise

tightened

1. Connect the base rail connectors (M) to the base rails (G) and bottom U bars (F) 

    with the long screw and nut (O).

2. Attach the castors (N) to bottom of the base rails until it is securely locked. Insert 

    the white lower side stands (E) in the bottom U bars and screw (P) in place.

3. Connect the front top horizontal bar (C) to the chrome upper front posts (D) by 

    using the front post connectors (K). Use a cushioned hammer if necessary. 

4. Insert the two chrome upper back posts (A) and the back top horizontal bar (B) 

    into the back post connectors (J).  Place each of the extendable posts (I) into the 

    horizontal bar. 

5. Once you have completed assembling the front and back garment arms, insert 

    them into the stands of the rack with the red marker facing down first. To lock the 

    upper posts into position, tighten the locking screws (L) clockwise.    

    

Note: 

 Check that all joints and posts are firmly fixed together.

6. Place the wire shelf (H) onto the bottom U bars of the rack.

7. Whilst adjusting the height or length of the rack, leave at least 5cm inside the 

    frame as indicated by the red markers.

Care & Use

• Wipe clean with a soft damp cloth. Never use scourers, abrasives or chemical 

   cleaners.

Отзывы: