X3-KIT
Installation and Operation Manual
PG 10/40
REV: BETA (4/25/2019)
5.2.
Kit Layout and Locations
X3-KIT consists of following sub-systems, located on vehicle, as follows:
ITEM
DESCRIPTION
MOUNTING LOCATION
APPROX.
INSTALL TIME
1
6350RC Air Compressor
Rear Frame, Driver Side
(behind fender and below rear deck)
1-2 Hours
2
1 Gal. Air Tank
Rear Frame, Passenger Side
(behind fender and below rear deck)
1-2 Hours
3
102 Series Dual Horn with Air Solenoid
Front Sway bar Mounts,
(directly behind front shocks)
2-4 Hours
Figure 1
–
Top View Showing Kit Layout (2018 X3 2 Door Shown)
5.3.
Approximate Installation Time
X3-KIT is a multi-faceted product consisting of multiple mechanical, electrical, and pneumatic components.
For a typical home mechanic, auto enthusiast, or technician installing a Kleinn Bolt-On kit for first time, a
professional installation job with setup and testing of final product, is estimated to take:
•
4-8 Hours
End of Section