
INSTALLATION
WALL DRILLING AND BRACKET FIXING
As a first step, proceed with the following drawings:
z
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
z
A horizontal line
A
at
1320
–
1700
mm above the
FRRNWRS
.
z
A horizontal line
B
at a minimum
926
mm above the
FRRNWRS
.
z
A horizontal line
C
at a minimum
RSWLRQDO
mm above the
FRRNWRS
.
Mark Points:
z
Mark a point
(1)
on the horizontal line
A
,
60
mm to the right of the vertical reference line.
z
Repeat this operation on the other side, checking that the two marks are leveled.
z
Mark a point
(2)
on the horizontal line
B
,
80
mm to the right of the vertical
UHIHUHQFHOLQH
z
Repeat this operation on the other side and on the vertical reference line, checking that the
WKUHHPDUNVDUHOHYHOHG
12
21
11
11
10
10
20
10
11
5
$
%
&
237,21$/
&