Your swag includes:
Foam mat (50mm high-density foam)
14 x steel pegs (6mm)
1 x aluminium alloy pole (2485mm x 11mm)
1 x aluminium alloy pole (1965mm x 11mm)
1 x aluminium alloy pole (1620mm x 11mm)
5 x adjustable alloy porch poles (950mm x 19/22mm)
8 x guy ropes
Morepork 1 Deluxe Swag
Model No. KC077-021
Filename: 5246_KC077-021_Morepork 1 Deluxe_Instructions
Dimensions: 290mm W x 170mm H
Colour: Black
1. Select a dry, level site and clear the ground of any
sharp objects.
2. Remove the swag from it’s carry bag, untie buckles
and unroll swag, keep all zips closed to keep the
swag in its correct shape.
3. Peg out the points where poles will be attached.
4. Assemble the three aluminium alloy poles by
interlocking the sections.
Step 5
Step 7
5. Feed the longest pole through the sleeve at the head
of the swag and the shortest pole through the sleeve
at the foot of the swag.
6. Secure the ends with the eyelets. Clip speed-clips to
pole to help hold the pole in place.
7. Open the side entrance and insert the remaining
pole through the middle roof hole and canvas sleeve.
Secure the ends with the eyelets. Clip speed-clips to
pole to help hold the pole in place.
8. Peg out the end entrance vestibule.
9. Rope out the guy ropes and fine tune so it remains
taut and positioned correctly.
10. Finally, assemble poles to pitch out either door to
create a porch area and secure with guy ropes.
To make sure the tent stays
in place insert the pegs into
the ground at a 45° angle,
not straight down.
PITCHING INSTRUCTIONS
REVERSE THE PROCEDURE TO LOWER SWAG