HAZARDOUS VOLTAGES ARE PRESENT IN THE CONTROL BOX, OTHER ELECTRICAL COMPONENTS,
AND CONNECTIONS BETWEEN THESE COMPONENTS.
Before performing ANY mechanical or electrical maintenance on the equipment, de-energize (disconnect) the main
switch supplying power to the equipment; as well as lock and tag the main switch in the de-energized position.
Refer to ANSI Z244.1, “Personnel Protection – Lockout/Tagout of Energy Sources”.
Only trained and competent personnel should inspect and repair this equipment.
It is the responsibility of the owner/user to install, inspect, test, maintain, and operate a hoist in accordance with
ANSI/ASME B30.16, “Safety Standard for Overhead Hoists”, OSHA Regulations and ANSI/NFPA 70, National
Electric Code. If the hoist is installed as part of a total lifting system, such as an overhead crane or monorail, it is
also the responsibility of the owner/user to comply with the applicable ANSI/ASME B30 volume that addresses that
type of equipment.
It is the responsibility of the owner/user to have all personnel that will install, inspect, test, maintain, and operate a
hoist read the contents of this manual and applicable portions of ANSI/ASME B30.16, “Safety Standard for
Overhead Hoists”, OSHA Regulations and ANSI/NFPA 70, “National Electric Code”. If the hoist is installed as part
of a total lifting system, such as an overhead crane, the applicable ANSI/ASME B30 volume that addresses that
type of equipment must also be read by all personnel.
If the hoist owner/user requires additional information, or if any information in the manual is not clear, contact
Harrington or the distributor of the hoist. Do not install, inspect, test, maintain, or operate this hoist unless this
information is fully understood.
A regular schedule of inspection of the hoist in accordance with the requirements of ANSI/ASME B30.16 should be
established and records maintained.
TNER hoists may be supplied with an auxiliary control circuit to be used for individual control while connected to a
multiple hoist control system. Always disable the multiple hoist controller when operating the hoist with local
pendant control. Failure to do so will cause a potentially hazardous situation. Always use a single control source
when operating the hoist.
Содержание TNER Series
Страница 37: ...This Page Intentionally Left Blank 37...
Страница 38: ...Figure 9 1 Housing and Motor Parts 38 9 1 Housing and Motor Parts...
Страница 41: ...This Page Intentionally Left Blank 41...
Страница 42: ...Figure 9 2 Gearing Parts 9 2 Gearing Parts 42...
Страница 44: ...Figure 9 3 Hook Parts 9 3 Hook Parts 44...
Страница 46: ...Figure 9 4 Chaining Parts 9 4 Chaining Parts 46...
Страница 48: ...Figure 9 5 Electric Parts 9 5 Electric Parts 48...
Страница 53: ...53 Appendix A Wiring Diagram...
Страница 54: ...54...