Figure 3-8
Limit Switch Components – 25 Ton TCR25000C2 and TCR25000P2
3.11.5 Measure and record the “K” dimension of all hooks on hoist. See
Table 5-6
under
Section 5
,
“Inspection”. Always use the same side of the hook to measure and record the "K" dimension.
3.11.6 Record the hoist Code Number and Serial Number (from the nameplate on the hoist – see
Section 10
)
in the space provided on the cover of this manual.
3.11.7 Ensure that the hoist is properly installed to either a fixed point, or trolley, whichever applies.
3.11.8 If hoist is installed on a trolley, ensure that
trolley is properly installed on the beam, and
stops for the trolley are correctly positioned and securely installed on the beam.
3.11.9 Ensure that all nuts, bolts and split (cotter) pins are sufficiently fastened.
3.11.10 For hoists with pendant controls, Ensure that the Pendant Hoses and Strain Relief Chain are properly
attached to the hoist. See
Section 7.4
.
3.11.11
Check Air Supply - Check air supply before everyday use. Ensure proper air
quality and air pressure.
3.11.12
Check the lubricator for proper function and adequate oil level.
3.11.13 Confirm proper operation.
Before operating read and become familiar with
Section 4
- Operation.
Before operating ensure that the hoist (and trolley) meets the Inspection, Testing and Maintenance
requirements of ANSI/ASME B30.16.
Before operating ensure that nothing will interfere with the full range of the hoist’s (and trolley’s)
operation.
3.11.14 Proceed with trial operation to confirm proper operation.
Initially operate slowly under no load in both directions. Verify controls agree with hoist direction.
Perform inspections per
Section 5.3
, “Frequent Inspections”.
Содержание Harrington TCR
Страница 11: ...11 Figure 2 2 Hoist Part Identification Diagrams 25 Ton TCR25000P2 and TCR25000C2...
Страница 42: ...42 NOTES...
Страница 43: ...43 NOTES...
Страница 46: ...2 of 10 TCR10000...
Страница 50: ...6 of 10 TCR25000...