![KitchenAid Architect Series II KURO24LSBX Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/kitchenaid/architect-series-ii-kuro24lsbx/architect-series-ii-kuro24lsbx_technical-education_20579046.webp)
5-2
See Page 4-14 for access and removal pro-
cedures for the light switches.
Touch the leads of an ohmmeter to the termi-
nals of the normally closed door switch.
The meter should indicate continuity (closed
circuit).
Push the door switch in and the meter should
indicate no continuity (open circuit).
Touch the leads of an ohmmeter to the termi-
nals of the manual rocker light switch.
When the switch is pressed on the “O” side
the meter should indicate no continuity (open
circuit).
When the switch is pressed on the “I” side
the meter should indicate continuity (closed
circuit).
1.
2.
3.
4.
5.
6.
7.
LIGHT SWITCHES
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
See Page 4-18 for access and removal pro-
cedures for the Relay / Overload.
Touch one lead of an ohmmeter to the top
terminal on the front and the other lead to the
top terminal on the back of the overload.
The meter should indicate continuity (closed
circuit).
1.
2.
3.
RELAY / OVERLOAD
Door
Switch
Rocker Light
Switch
Top terminal on
the front.
Top terminal on
the back.
Содержание Architect Series II KURO24LSBX
Страница 12: ...2 4 NOTES ...
Страница 14: ...3 2 NOTES ...
Страница 44: ...4 30 NOTES ...
Страница 50: ...5 6 NOTES ...
Страница 53: ...7 1 WIRINGDiagrams Wine Cellar Wiring Diagram ...
Страница 54: ...7 2 Beverage Center Wiring Diagram ...
Страница 55: ...7 3 Undercounter Refrigerator Wiring Diagram ...
Страница 56: ...7 4 NOTES ...
Страница 58: ......