background image

Содержание 3KUIS185V

Страница 1: ...Ki chenAid Automatic Ice Maker Model 3KUIS185V INSTALLATION INSTRUCTIONS ...

Страница 2: ...ce maker 2 Remove the Iwo acraws on the top of the pane assembly REMOVE ALL DOOR INSULATION RIBS TO ACCEPT WOOD PANEL THICKNESS FIGURE 2 3 Slide the metal panels and spacers 01 1 4 Slide the wood panel into Ihe door frame 5 Replace the top of the panel assembly NOTE Make sure the galvanized panel is replaced I back of the panel assembly If ice maker is installed above two thousand feet of altitude...

Страница 3: ... side WIII be complelely unobstructed to provide Draper air flow 2 Area should be well ventllaled wth temperature above 150 C 600 F and below 430 C 1100 F Best results are obtained between 210 C 700 F and 320 C 900 F 3 Prov slon lor eleclr city water and drain connec lions should be delermlned 4 The unit may be closed in on Ihe top and lhree sndes bul Ihe Iron1 MUST BE u obs r c ed lor air circula...

Страница 4: ...QUIREMENTS A 220 240 Volt 50 Hz 10 Amp used electrical supply is required lime delay luse or circuit breaker is recommended It is recommended lhat a Separate clrcuil serving only this appliance be provided USE COPPER WIRE ONLY RECOMMENDED GROUNDING METHOD ELECTRICAL GROUND IS REGUIRED ON THIS MACHINE For your personal salety permanently ground this unit in accordance with applicable local codes an...

Страница 5: ...ed in a well ventilated area wth temperalure above 15 C 50 F Best resulls are oblalned at lem peratures between 21 C 70 F and 32 90 F 1s properly connected to a waler supply and drain l IS properly connected lo electruty A 2201240 Volt 50 Hz 1 phase 10 amp fused electrIcal supply IS required NOTE Time delay fuse or clrcult breaker IS recommended l IS properly electrically grounded l IS nol operate...

Страница 6: ...fer to lhe Use and Care Guide l Before starling wash OUI lnlerlor of cablnel with a Bakmg Soda solution 2 lablespoons soda to a quan of warm waler Fllnse thoroughly 0 Make cenam Ihe waler IS turned on 0 Turn swtch to the ON pos l on IMPORTANT Allow unitto run lor 3 hour before expectlnp Ice and for 24 hours bofor trylng lo eet Ihe lhlcknore wntml If instollod above 2 ooO fwt altitude SW pa 2 for t...

Страница 7: ...Ihe pump opera1es I Check condenser fan to make sura II IS revolving 1 water Will not en1er pump pan Unlll Ireezlng plate gels told and machInegoes 8 lo a harvest cycle I Check for even water flow over freezIng plale Unit must be level for proper operallon v Check for desired cube thickness and after 24 hours adjust if necessary Maximum ice yield will be obtained with ice lhickness at 13 mm lo v 5...

Страница 8: ...Part No 759099 Prtnted In U S A ...

Отзывы: