KisanKraft
®
Centrifugal Water Pump for
Agriculture
KK-WPE-2510-4015-5020
: +91.80. 22178200
Page 9 of 16
9.
The pipes must always be fitted using the related
brackets (Fig. C) to avoid transmitting stress to the
pump body. Take care not to overtightening the
pipes when fitting them.
Electrical Connections
1.
The installer is responsible for making the
electrical connections to the mains supply in
compliance with the relevant regulation in force:
2.
Make sure that the specifications on the pump
rating plate and the rated line values are the
same (Fig. D)
3.
Connect the pump to an effective earth circuit
and then connect up the phases following the
diagram on the terminal block cover or rating
plate
4.
Our single
–phase motors are protected against
overloads using a thermal device (overload
cutout) fitted in the winding. Users are
responsible for fitting a suitable protection
device for three-phase motors.
5.
Check that the three-phase pumps rotate
clockwise when looking at the pump from the
motor fan side, swapping over two of the phase
connections if they do not (Fig. E)
6.
Priming: Fill the pump completely with clean
water before switching it on. The water should
be poured in through the priming plug (Fig F).
7.
When you have completed the operation, screw
the plug back in again and start the pump. The
pump should be primed again whenever it has
not been used for a long period of time or when
air has made its way into the system.
Important: Never run the pump empty. If this happens by mistake, switch the pump
off, wait it to cool down and then prime it using clean water.