background image

IOM/KPDS/NOV 19/00

                               

Page 27

27

27

27 of 50

50

50

50    

   

   

   

   

Issue Date : 22/11/2019 

 

                                                                                                              Revision: 00

 

 

Remove  the  bearing  holder  (25400)  from  stuffing  box  housing  (23800).  Note  that 
removal of bearing housing cover and bearing from housing is not needed. 

 

Remove  mechanical  seal  assembly  from  stuffing  box  housing  (23800)  along  with 
the gasket. 
 

Mechanical seal assembly procedure-For EBIPL make seal. Refer Fig. A. 

 

Apply  grease  on  sleeve-O  ring-mating  ring  (111.30),  apply  grease  and  put  the 
gasket-gland (444.05)-(Refer Fig. 1-EBIPL mechanical seal drawing). 

 

Apply  grease  on  shaft  for  easy  movement  of  seal  on  shaft.  Mount  the  seal 
assembly on the shaft. Tight the head cap screw of seal to fix the seal on stuffing 
box. (Refer Fig. 1-EBIPL mechanical seal drawing). 

 

Assemble  the  bearing  holder  (25400)  along  with  bearing  on  the  stuffing  box 
(23800).  Put  the  key  for  thrust  bearing  carrier  (32400).  Put  the  bearing  spacer. 
Then tighten the bearing lock nut (33500) and hex. lock nut (33600).  

 

Now adjust the float as per requirement. 

 

Then  tight  the  grub  screw  of  mechanical  seal  (944.17)  so  that  seal  position  and 
operating length get maintained. (Refer Fig. 1-EBIPL

 

mechanical seal drawing). 

 

Remove  the  socket  head  cap  screw  (943.14).  Then  rotate  the  locking  strip  and 
keep in opposite position so that it will not get fitted in a groove provided on mating 
ring-composite  (301.00).  Again,  tighten  the  socket  head  cap  screw  (Refer  Fig.  1-
EBIPL mechanical seal drawing). 

 

Put  the  pump  side  hub  of  the  coupling  on  pump  shaft.  Then  assemble  the  motor 
stool along with motor on the support plate. 

 

Mechanical seal disassembly procedure for Flowserve make seal. Refer Fig. A. 
 

 

Decouple  the  coupling,  keep  motor  side  coupling  on  motor  shaft.  Do  not  remove 
motor from motor stool. 

 

Remove the motor stool (29000) along with motor from support plate (46700). 

 

Remove pump half coupling from pump shaft. 

 

Rotate  retainer  plates  of  mech.  seal  and  lock  it  with  seal,  with  cap  screws  (K) 
available  on  the  collar  (5)  to  maintain  operating  length.  (Refer  Fig.  2-Flowserve 
mechanical seal drawing). 

 

Loose the set screws so that seal assembly gets free from sleeve (10) (Refer Fig. 2-
Flowserve mechanical seal drawing). 

 

Remove hex. lock nut (33600), bearing lock nut (33500) from pump shaft. 

 

Remove  the  bearing  cover  (27000)  and  then  remove  spacer.  Then  remove  key  for 
thrust bearing carrier (32400).  

 

Remove  the  bearing  holder  (25400)  from  stuffing  box  housing  (23800).  Note  that 
removal of bearing housing cover and bearing from housing is not needed. 

 

Remove  the  circlip,  and  then  remove  seal  assembly  from  the  stuffing  box  housing 
along with gasket. 

 

Remove  sleeve  (10)  along  with  key.  (Refer  Fig.  2-Flowserve  mechanical  seal 
drawing). 

 

Mechanical seal assembly procedure for Flowserve make seal. Refer Fig. A. 
 

 

Apply  grease  on  O-ring  area  of  sleeve.  Also  apply  on  the  area  for  gasket.  Put  the 
gasket. 

 

Put the key on the shaft.  

 

Apply grease on shaft for easy movement of seal on shaft. 

Содержание KPDS

Страница 1: ...NSTALLATION OPERATION AND MAINTENANCE FOR KIRLOSKAR PUMP TYPE KPDS KPDSQF KIRLOSKAR BROTHERS LIMITED REGISTERED OFFICE UDYOG BHAVAN TILAK ROAD PUNE 411002 GLOBAL HEADQUARTERS YAMUNA SURVEY NO 98 3 7 B...

Страница 2: ...2 months from the date of commissioning the equipment or 18 months from the date of dispatch from our factory whichever is earlier Our liability in respect of any complaint is limited to replacing par...

Страница 3: ...TOOLS AND EQUIPMENTS 9 8 EQUIPMENT SCHEDULE 10 9 EQUIPMENT OPERATION 10 10 ERECTION ASSEMBLING PROCEDURE 11 11 OPERATION 17 12 MAINTENANCE 18 13 TECHNICAL DATA 22 14 CROSS SECTIONAL ASSEMBLY DRAWINGS...

Страница 4: ...re of rigid construction However proper installation operation and maintenance are equally important to ensure trouble free service This booklet covers important guidelines and instructions for instal...

Страница 5: ...the Health and Safety Dossier DHS and any procedures detailed within these instructions shall be followed The pump supplied by Kirloskar Brothers Limited KBL has been designed with safety in mind wher...

Страница 6: ...o general mechanical aspects of safety Hazard This symbol refers to electrical safety 2 2 Environmental safety Always keep the station clean to avoid and or discover emissions Waste and emissions regu...

Страница 7: ...in serious physical injury and or equipment damage Lift equipment only at the specifically identified lifting points Lifting devices such as eyebolts slings and spreaders must be rated selected and us...

Страница 8: ...A With Rectangular Support plate B With Round Support plate Figure 1 NOTE It is recommended to dismantle the motor from pump along with electrical connections and then lift the pump assembly This is...

Страница 9: ...g d The shaft should be manually rotated periodically preferably once in a month to prevent pitting of the bearing surfaces by moisture For exposed storage or extreme variants in atmospheric or enviro...

Страница 10: ...er This is necessary to ensure individual flow pattern of each pump undisturbed by other pumps 4 2 4 Pump Submergence The lowest liquid level should be as recommended in the outline drawing supplied a...

Страница 11: ...is shown on outline drawing against order 5 3 2 The pump house should provide sufficient cross travel of the trolley so that the pump assembly can be moved without any hindrance or receiving any undue...

Страница 12: ...um and the hand chains provided should be long enough to operate it conveniently from the floor The chain pulley block of 3 tons capacity is more suitable 7 2 Chain and lifting hook 7 3 Jute ropes cro...

Страница 13: ...nt between the pump shaft and the drive shaft which are 1 Angular misalignment shaft with axis concentric but not parallel 2 Parallel misalignment shaft with axis parallel but not concentric This misa...

Страница 14: ...he defects 9 4 During stopping the pump 1 Close the valve on the delivery line 2 Stop the motor 3 Close the cooling water liquid connections 4 It has always recommended that use of NRV Non return valv...

Страница 15: ...l along with bush in casing cover and fix the hex socketed cap screws 66601 Mount the cover 27801 on bearing shell and fix 4 nos non metallic screws 10 2 Insert casing cover 22000 on to the pump shaft...

Страница 16: ...1302 in between the flanges and tighten the nuts and bolts 10 5 Apply thread compound liberally inside the screwed coupling 39500 Fit the screwed coupling on impeller shaft 18600 and then fit intermed...

Страница 17: ...oid the rotation of bush This is required in case of replacement of bush only Mount cover 27801 on bearing spider with the help of screws Fix non metallic screw on bearing spider to avoid the rotation...

Страница 18: ...than one piece 10 21 Mount the shaft sleeve 31000 with O Ring 52300 and key 32300 Mount circlip 48600 to locate the shaft sleeve 10 22 Fit the pipe nut 33801 with gasket 68000 and washer 62500 on ris...

Страница 19: ...head shaft 18500 and then fit bearing nut 33500 and lock nut 33600 on the head shaft 18500 Do not tighten the lock nut till the final stage of assembly 10 34 Mount the motor stool 29000 on support pl...

Страница 20: ...th the help of filler gauge and parallel alignment with the help of straight edge and filler gauge Alignment should be within 0 05 mm 10 41 Grease the bearing 26300 with the help of grease gun 10 42 E...

Страница 21: ...ormal noise or vibrations are observed Detect the reasons for vibrations and restart the pump after eliminating the reasons for the same 11 3 2 Take the temperature of bearing holder 25400 For this ke...

Страница 22: ...section drawing 12 4 Use following procedure while dismantling the pump 12 4 1 Disconnect the delivery pipe connections above support plate 46700 Unscrew the fasteners holding support plate on the fla...

Страница 23: ...the shelling on the arms of the pump 12 4 16 Fit another pair of clamp on standard column pipe 13302 next below the top column pipe 12 4 17 Allow the unit to lower down so as to rest the clamps on the...

Страница 24: ...h the help of suitable puller 12 4 35 After dismantling the parts as indicated above clean them and inspect them for wear tear and damage Especially following parts should be specifically inspected a...

Страница 25: ...cable and affix suitable isolation warning signs to prevent inadvertent re connection In order to avoid the possibility of maintenance personnel inhaling dangerous fumes or vapors it is recommended th...

Страница 26: ...25400 A sudden increase in temperature is an indication of danger and signal to investigate Occasionally when pumps are first started the bearing seems to run extremely hot This high temperature is f...

Страница 27: ...e size one size higher than delivery size of pump casing 3 For rising pipe size two size higher than delivery size of pump casing KPDS 20 13QF 20 16QF 20 20QF 1 20D x 120D x 1T 2 25D x 125D x 1T KPDS...

Страница 28: ...D x 1T 3 163D x 200D x 1T KPDS 125 26 45 1 138D x 165D x 1T 2 163D x 200D x 1T 3 213D x 270D x1T KPDS 150 32 40 1 163D x 200D x 1T 2 213D x 270D x 1T 51500 Gasket for impeller and shaft sleeve KPDS 20...

Страница 29: ...13 8 If transmission bearing lubrication is EXTERNAL clear water or compatible liquid the pressure and quantity required to be calculated as given under Pressure 1 30 x Total head in meters x sp gr 1...

Страница 30: ...Again tighten the socket head cap screw Refer Fig 1 EBIPL mechanical seal drawing Put the pump side hub of the coupling on pump shaft Then assemble the motor stool along with motor on the support plat...

Страница 31: ...ng box 23800 Put the key for thrust bearing carrier 32400 Put the bearing spacer Then tighten the bearing lock nut 33500 and hex lock nut 33600 Now adjust the float as per requirement Tight the set sc...

Страница 32: ...IOM KPDS NOV 19 00 Page 29 29 29 29 of 50 50 50 50 Issue Date 22 11 2019 Revision 00 FIGURE 1 FIGURE 2...

Страница 33: ...DE 19200 IMPELLER RING SUCTION SIDE 19300 IMPELLER RING DELIVERY SIDE 21600 STRAINER 22000 CASING COVER 22700 LANTERN RING 22900 SPLIT GLAND 23800 STUFFING BOX HOUSING 24500 BEARING SPIDER 24700 THRUS...

Страница 34: ...TERNAL CIRCLIP 49001 DELIVERY FLANGE ABOVE SUPPORT PLATE 50001 OIL SEAL DE 50002 OIL SEAL NDE 51100 GASKET FOR CASING COVER 51200 GASKET FOR ADAPTOR PLATE 51301 GASKET FOR CASING AND BEND 51302 GASKET...

Страница 35: ...IOM KPDS NOV 19 00 Page 32 32 32 32 of 50 50 50 50 Issue Date 22 11 2019 Revision 00...

Страница 36: ...IOM KPDS NOV 19 00 Page 33 33 33 33 of 50 50 50 50 Issue Date 22 11 2019 Revision 00...

Страница 37: ...IOM KPDS NOV 19 00 Page 34 34 34 34 of 50 50 50 50 Issue Date 22 11 2019 Revision 00...

Страница 38: ...IOM KPDS NOV 19 00 Page 35 35 35 35 of 50 50 50 50 Issue Date 22 11 2019 Revision 00...

Страница 39: ...IOM KPDS NOV 19 00 Page 36 36 36 36 of 50 50 50 50 Issue Date 22 11 2019 Revision 00...

Страница 40: ...IOM KPDS NOV 19 00 Page 37 37 37 37 of 50 50 50 50 Issue Date 22 11 2019 Revision 00...

Страница 41: ...IOM KPDS NOV 19 00 Page 38 38 38 38 of 50 50 50 50 Issue Date 22 11 2019 Revision 00 15 EXPLODED VIEW...

Страница 42: ...IOM KPDS NOV 19 00 Page 39 39 39 39 of 50 50 50 50 Issue Date 22 11 2019 Revision 00...

Страница 43: ...IOM KPDS NOV 19 00 Page 40 40 40 40 of 50 50 50 50 Issue Date 22 11 2019 Revision 00...

Страница 44: ...IOM KPDS Issue Date 10 08 2007 Page 41 of 50 Last Revision 20 07 2017...

Страница 45: ...IOM KPDS Issue Date 10 08 2007 Page 42 of 50 Last Revision 20 07 2017...

Страница 46: ...IOM KPDS Issue Date 10 08 2007 Page 43 of 50 Last Revision 20 07 2017...

Страница 47: ...IOM KPDS Issue Date 10 08 2007 Page 44 of 50 Last Revision 20 07 2017...

Страница 48: ...ve access to and study the product instruction manual BEFORE any work is done and that they will comply with all local and industry based safety instructions and regulations 1 4 Ear defenders should b...

Страница 49: ...ve 80 C are being pumped alignment should be checked and reset with the pump and motor at their normal operating temperature If this is not possible KBL can supply estimated initial offset figures to...

Страница 50: ...ated Isolate the equipment before any maintenance work is done Switch off the main supply remove fuses apply lockouts where applicable and affix suitable isolation warning signs to prevent inadvertent...

Отзывы: