background image

         StorCase Technology, Inc.

RJR110 User’s Guide - Rev. A02

9

Installing the Receiving Frame

The drive should be installed into the carrier before installing the receiving frame into the

mounting bay of a computer or expansion chassis.

1.

Turn OFF power to computer or expansion chassis.

2.

Open computer or expansion chassis according to manufacturer’s instructions.  If

necessary, temporarily remove any expansion boards that may make installation

difficult.

3.

With the drive carrier locked into place inside the receiving frame, install the Rhino

JR

into the 5.25” drive opening in the computer or expansion chassis.  Fasten into

place with the four (4) #6-32 Phillips Pan Head screws provided.

4.

 Adjust the front of the receiving frame so that the carrier slides freely in and out of

the receiving frame guides.  The position of adjoining peripheral units may require

adjustment.

5.

Connect the I/O cable from the host adapter to the receiving frame.

6.

Connect the DC power cable from the DC power supply in the computer or expan-

sion chassis to the power connector on the Rhino

JR

 receiving frame rear panel.

7.

Replace any expansion boards that may have been removed earlier.  Replace the

system  cover  according  to  the  manufacturer’s  instructions.

8.

Reconnect any system or peripheral cables removed earlier.

9.

Turn ON power to the computer.  If the installation was successful, and all cables

have been properly attached, the system should boot normally.

All manuals and user guides at all-guides.com

Содержание S21B109

Страница 1: ...able Drive Enclosure User s Guide Part No D89 0000 0258 A02 July 2005 StorCaseTechnology Inc 17600NewhopeStreet FountainValley CA92708 9885 Phone 714 438 1850 Fax 714 438 1847 All manuals and user gui...

Страница 2: ...se interface cables and other accessories specifically intended for use with the StorCase products identified above are also covered by this 7 year warranty Three Year Warranty The following component...

Страница 3: ...tem This warranty covers only repair or replacement of defective StorCase products as described above StorCase is not liable for and does not cover under warranty any costs associated with servicing a...

Страница 4: ...nd Flicker EN 55024 1998 ITE Immunity EN 61000 4 2 EN 61000 4 5 EN 61000 4 3 EN 61000 4 6 EN 61000 4 4 EN 61000 4 11 FCC Part 15 Class B AS NZS 3548 Information Technology Equipment 2004 Company Name...

Страница 5: ...25 half height peripheral slots The RhinoJR is constructed of lightweight aluminum and polycarbonate and allows a drive to be removed and transported to another RhinoJR equipped computer or expansion...

Страница 6: ...authorized removal or installation of the carrier For the computer to access data on the disk drive the key must be turned counterclockwise to the locked position LEDs Power Steady glow indicates powe...

Страница 7: ...d 4 pin DC Power Connector to accept DC power I O Connector The input output connector provides a standard interface for all IDE signals Fan Receiving frame fan provides enhanced heat dissipation 4 7...

Страница 8: ...so that the drive connectors can mate with the carrier connectors Once the drive and carrier are mated tighten the adjustment screw to secure power connector into place Turn the drive carrier assembl...

Страница 9: ...echnology Inc 8 Figure 6 Installing a Drive into the Carrier Adjust if Necessary Loosen Screw to Adjust Figure 5 Adjusting the DC Power Connector IDE Drive Not Included Bottom Mount Drive 1 2 All manu...

Страница 10: ...6 32 Phillips Pan Head screws provided 4 Adjust the front of the receiving frame so that the carrier slides freely in and out of the receiving frame guides The position of adjoining peripheral units...

Страница 11: ...ent of 10 per hour 2 11 msec pulse width 1 2 sine wave Weight 1 0 lb 0 45kg Weight with NO drives installed 4 7 CFM Cooling Total for 1 Fan 1 NOTICE This User s Guide is subject to periodic updates wi...

Отзывы: