background image

 

Issue 

Description 

Date 

 

 

 

01 

Initial Issue – CC1392 

August 2017 

 

018316  

INSTALLATION & OPERATION 

GUIDELINES FOR SINGLE PIECE UNITS 

BIODISC

®

 BN

 

 

 

Kingspan Environmental Service Contact Numbers: 

 

GB:  0844 846 0500 

NI:   028 3025 4077  

IRL: 048 3025 4077

 

 
 
 

 

 

 

 
 

 

 
 

 

 

 

 

 
 

DS1334 

BN BioDisc General Assembly – Sales Drawing 

      Enclosed Documents 

Содержание Klargester BIODISC BN

Страница 1: ...ust 2017 018316 INSTALLATION OPERATION GUIDELINES FOR SINGLE PIECE UNITS BIODISC BN Kingspan Environmental Service Contact Numbers GB 0844 846 0500 NI 028 3025 4077 IRL 048 3025 4077 DS1334 BN BioDisc...

Страница 2: ...equipment Kingspan offer a range of maintenance contracts details on request Should you wish to inspect the operation of the equipment please observe all necessary precautions including those listed...

Страница 3: ...ing a Kingspan product This manual will help you to keep it operating efficiently over a long service life Please read this manual thoroughly preferably before installation This manual should be refer...

Страница 4: ...FED THREE PIECE SYSTEM PST INLET INVERT OPTIONS 600mm 1100mm 1500mm BIODISC BIODISC PUMP STATION H H K F F E G J D D STANDARD SINGLE PIECE SYSTEM G L G L G Note Illustrations are schematic Refer to G...

Страница 5: ...5500 5650 Standard Power Supply 400V 3 Phase Motor Rating 1 Phase Watts 2 x 370 Full Load Current 3 Phase Amps 2 x 1 35 Sludge Return Pump Rating Watts 480 Pump Station Diameter J mm 900 Flange Height...

Страница 6: ...essential to maintain permeability 4 1 6 The BioDisc system must be installed at a level which will allow connection to the incoming drain and a free discharge at the system outlet Effluent pumping st...

Страница 7: ...mly supported so that point loads through the unit are avoided 5 1 5 Refer to the drawings attached for dimensions of units 5 1 6 The Concrete Specification is not a site specific installation design...

Страница 8: ...unit 250 500mm above the concrete backfill level but do not attempt to fill the unit with water above the outlet level 5 2 12 Remove blanking cap from the cable duct at the outlet end of the unit 5 2...

Страница 9: ...Automatic grease cartridges 6 2 1 The shaft roller bearings are fitted with pressurised grease cartridges These should be activated before the unit is started 6 2 2 Turn the control knob and it s link...

Страница 10: ...tant that you are aware of the following points 7 1 2 Your BioDisc system uses colonies of live natural micro organisms biomass to break down the pollutants in the sewage Many chemicals used in househ...

Страница 11: ...ble peelings etc its cheaper and environmentally friendly 7 2 5 Home beer and wine making This presents a similar problem to waste disposal units The BioDisc has to work as hard to treat one pint of b...

Страница 12: ...any aspects of concern to your maintenance engineer 8 3 1 2 Check the appearance of the Biomass It should be light grey to grey at both first banks gradually changing to brown in both second stages a...

Страница 13: ...er points B and C may be removed for access if required 9 2 6 Note While de sludging ensure that there is never more than 250mm difference in water levels between points A and C 9 2 7 DO NOT attempt t...

Страница 14: ...ty to inspect the goods so as to confirm that they are defective c the goods not having been modified mishandled or misused and being used strictly in accordance with any relevant instructions issued...

Страница 15: ...ER OF THE PROPERTY IS LEGALLY RESPONSIBLE FOR ENSURING THAT THE SYSTEM DOES NOT CAUSE POLLUTION A HEALTH HAZARD OR A NUISANCE We recommend that a separate log is kept of all maintenance and service vi...

Отзывы: