FPB30
FIRE BOWL SETUP
This is a Non-Combustible Enclosure.
!
WARNING
THE INSTALLATION OF THIS KIT MUST ONLY BE UNDERTAKEN BY A QUALIFIED AND CERTIFIED GAS
APPLIANCE INSTALLER.
PARTS LIST:
Fire Bowl
30FPB-KWK – Decorative Key Way Valve Kit
[1] Bag MLR1410 – ¼” Lava Rock (20LBS)
Leg Extension Set (3 Leg Pieces, 3 Cross
Braces)
Filler Strip Ring ( 3 Pieces - Assembled)
SS Flex Connector (27FP-902FF)
Bag of Hardware
(3 Machine Screws & Nuts, 3 DT Screws)
2. Remove existing valve from Fire Pit assembly. Connect Key Way Valve Body to Fire Pit. Ensure that the manometer
tap is on the supply side of the line.
1. Invert Fire Pit and
attach Leg Extensions to
Fire Pit with [3] DT
Screws. Attach [3]
cross braces to Leg
Extensions with
hardware provided.
FIRE BOWL
REMOVE
ORIGINAL VALVE
FROM FIRE PIT
3
f i r e - p a r t s . c o m
Содержание FPB30
Страница 1: ...FPB30 Fire Bowl Setup fire parts com ...