background image

ASSEMBLY

& PARTS DIAGRAM/PART LIST 

ASSEMbLY

MOUNTING LEVELING SCREWS 

1) Install the 10 large wood screws (A) Fig.1 from underneath the table as

shown.

2) The wood screws (A) will act as leveling hardware for the Router Lift

(mod. XL-125) or the Phenolic Router Insert Plate (mod. XL-114).

MOUNTING MDF TAbLE TO FLOOR STAND (MOD. XL-085) 

1) To prevent damage, place a protective cover on work bench or floor, then

position the MDF Table (A) Fig.2 upside down (facing down) so the

underneath of the table is exposed. 

2) Position the completely assembled Floor Stand (mod. XL-085) upside

down onto the table as shown. Make sure the front of the Floor Stand

faces the front of the MDF Table.

3) Align the 14 mounting holes in the Floor Stand with those of the MDF

Table, secure the Floor Stand to the MDF Table using 14 small wood

screws (B).

Note:

Additional small wood screws (B) Fig.2 are provided, these are used

to fix the Universal Dust Collection Kit (mod. XL-130) and the Router Fence

(mod. XL-080) to the underside of the MDF table.

Note:

2 countersunk allen head screws (A) Fig.3 are also provided, these

are used to fix the Router Lift (mod. XL-125) or the Phenolic Router Insert

Plate (mod. XL-114) as shown. 

FIGURE 1

FIGURE 2

FIGURE 3

Отзывы: