Kinetic Solar K-Rack™
Installation guide
Page 25 of 37
27 May 2019
ii.
Prepare roof for the installation of lag bolts by drilling two 7/32” pilot holes
through the roof and into the rafter for each Base Plate that will be affixed.
iii.
Screw each Base Plate into position using two lag bolts. The Base Plate
should be facing downward (holes up with respect to the peak of the roof,
stud facing outwards)
Figure 23 Measure and Pre-Drill
Figure 24 Install Lag Bolts