
SECTION 4
MAINTENANCE
Servicing Notes
Servicing should be carried out annually by a competent person such as a CORGI
registered engineer.
This is a condition of the Kinder Fires lifetime
guarantee schemes.
The service should include visually checking the chimney and fire opening for
accumulations of debris and a smoke test to check for a positive up-draught in the
chimney.
The condition of the pebbles should be checked and
if necessary the whole set
should be replaced with a genuine replacement set.
The burner assembly is designed to be removed as a complete unit for ease of
access.
After any servicing work a gas tightness check must always be car-
ried out.
For Diagrams refer to Section 2
4.1
Removing the burner assembly from the fire.
4.1.1
Prepare work area (lay down dust sheets etc.)
4.1.2
Lift the Camber trim and ash pan cover out of the way and put
them in a safe location. Remove the loose pebbles from the fuel bed
and front ceramic rail. Remove the front ceramic from the rail. Unscrew
the two pozi-driv fixing screws which secure the burner heat shield and
remove it from the fire.
4.1.3
Isolate the gas supply and remove the inlet pipe from the appliance
inlet elbow. Unscrew and remove the four screws which retain the
burner. Remove the burner assembly from the fire.
4.1.4
To refit the burner assembly. Push the base of the control panel fully
into the fire and secure with the four screws. Refit the gas supply pipe
and carry out a gas tightness test. Refit the burner heat shield then
refit the pebbles referring to section 3 for the correct layout. The
Camber trim and ash pan cover can now be re-positioned.
4.2
Removing the Piezo Igniter
4.2.1
Remove the burner assembly as in section 4.1
4.2.2
Disconnect the ignition lead from the piezo and unscrew the
retaining nut on the rear of the control panel. Withdraw the piezo from
the front of the control panel. Re-assemble in reverse order and carry
out a gas tightness test.
23