
Perks
®
2 of 2
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent.
If you have any questions concerning these instructions, please call Kimball Office Customer Care.
2382510 Revision -
Assembly Instructions
5.
For Perks Power Data Drawer:
Position assembled Flexchain top mount under the Perks
Power Data Drawer and align holes. Install four 6-32
machine screws and hex nuts. (Figure E).
Note: The Power Data Drawer has mounting cutouts on both
ends of the drawer.
For under worksurface mounting:
Position assembled Flexchain under the worksurface in
the approximate location desired. This may be under
a grommet or near a wire manager. Install four Pan Head
Phillips Wood Screws as shown. (Figure F)
6. Route cables as needed in cable areas. (Figure G)
Place the cable at the desired opening and gently push
the cable inside the cable area.
Figure E
Figure F
Perks Power Data
Drawer Mounting
4 Nuts
4 Machine Screws
Under Worksurface
Mounting
4 Screws
1/2” x 1 7/8”
Data Cable Areas
2 1/2” x 1 7/8”
Power Cable Area
Figure G
Data Cable
Push
Power Cable
Push
Data Cable
Push