Proper product installation, in accordance with these instructions, is the responsibility of the installing agent.
If you have any questions concerning these instructions, please call Kimball Office Customer Care.
Part 2997016,B
Assembly Instructions
5.
Install any Electrical Jumpers that go through the Con-
nector.
6.
Install the Connector Inside and Vertical Trim by aligning
the tabs with the mating slots in the connector brackets and
slide downward into place. The top tab on the Vertical Trim
should rest completely on the top connector bracket. Align-
ment can best be achieved by aligning lowest bracket first,
then the topmost bracket followed by any remaining middle
brackets. Install the small sheet metal screw in the top tab to
keep the Trim from become dislodged during frame reloca-
tion. See Figure C.
7.
Install the top cap by aligning the slot in the underside of the
top cap with the top of the Vertical Trim and tap into place.
See Figure D.
8.
After Panel Top Cap is installed, Prior to installing tiles,
ensure Connector Top Cap is flush with Panel Top Cap. If
adjustment is required, Loosen the Top Connector Bracket
bolts and lift or lower appropriately then retighten.
9.
Using Traxx Loc Brackets found in a separate box labeled
33PTLB, secure the bottom and beltline location of the Con-
nector Trim to the frame as shown in Figure F.
Note: When installing single sided electrical at beltline, Its im-
portant to orient the frames so the wider slots in the Mid Support
Rail is facing toward the side receiving the tech tile. Once the
electrical brackets are installed, Traxx secures the electrical
bracket in place. Double sided beltline electrical application gets
Traxx on both sides so frame orientation is not critical. See Fig-
ure E.