background image

     

 

 

1) Whenever changing a bit, make certain the Forward / Reverse Switch is in the “ OFF “ position and tool is

unplugged. 

2) Do not allow chemicals such as acetone, benzene, thinner, trichloroethylene ketone, or other similar

chemicals to come in contact with the screwdriver housing as damage will result. 

3) Do not drop or abuse the screwdriver.
4) Do not adjust the torque setting higher than 8 on the torque scale.
5) There should be a tool rest interval when cycles three seconds or longer. This tool is intended for a duty

cycle of 1.0 sec on, 3.0 sec off. 

6) Do not use this screwdriver for tightening wood screws. This is “ Metal Assembly Screw Driver ”
7) Do not operate the Forward / Reverse Switch the motor is running.
8) Whenever a tool is not being used, move the Forward / Reverse Switch to the “OFF” position and unplug

the screwdriver. 

9) Don't touch For&Rew Switch during operating for keeping system from wrong judgement.

Do not drop or abuse the tool.

Whenever a tool is not being used, position the Power Switch to the “OFF” position and unplug the power

cord.

Attaching / detaching bit and bit type   
Push up the holder clamp by finger tip, and it will be unlocked. Thus, the bit can be freely attached and 
detached (single finger notion type) select such a bit whose shank is equal to the size shown below.     

 Insert the power plug into a receptacle and set the changeover switch to “

F

 

 position. 

 Apply the bit to the screw head and press the lever or push main body to, then the switch will be turned 

ON to start the motor running. 

 When the screw is tighten and reach the torque that you had set, The tool will stopped automatically. 

 To reset the tool by releasing the lever to the original position or releasing the bit From the screw head. 

 To return the screw, set the changeover switch to “

R

” position. 

Maintenance and Inspection: 

1. The screw driver must be operated in top condition, one day working hour must be

not more than eight hours.

2. Please note don’t let the motor get over heated, every minute use 10~15 screws to operate.
3. The frequency use of this electric screw driver is over than eight hours a day, still it needs periodically

testing and treatment. Every 5-6 months.

4. Inspect tool cords periodically and if damaged, have them repaired by an authorized service facility.

Inspect extension cords periodically and replace if damaged.

5. Do not remove any labels. Replace any damaged label.

Operations Cautions 

CAUTION 

       Description of Operation  

Servicing 

Содержание SKD-BE830L

Страница 1: ... SKD BE830P SKD BE830PF SKD BE850P DC TYPE Non Carbon Brush Electric Screwdrivers KILEWS INDUSTRIAL CO LTD www kilewswest com KILEWS WEST USA INC 6945 LTC PKWY PORT ST LUCIE FL 34986 PHONE 772 293 0071 FAX 772 465 4368 EMAIL SALES KILEWSWEST COM Y2F055A E 004 Ver 3 0 ...

Страница 2: ...on enclosed Read all these instructions before placing tool in service or operation this tool and save these instructions It is the responsibility of the employer to place the information in this manual into the hands of the operator Failure to observe the following warnings could result in injury When using electric tools Basic safety precautions should always be followed to reduce the risk of fi...

Страница 3: ...ble for outdoor use Use of cord suitable for outdoor use reduces the risk of electric shock 3 Personal Safety a Stay alert watch what you are doing and use common sense when operating a power tool Do not use power tool while you are tired or under the influence of drugs alcohol or medication A moment of inattention while operating power tools may result in serious personal injury b Use safety equi...

Страница 4: ...ace if damaged f Keep cutting tools sharp and clean Properly maintained cutting tools with sharp cutting edges are less likely to bind and are easier to control g Use the power tools accessories and tool bits ect in accordance with these instructions and in the manner intended for the particular type of power tool taking into account the working conditions and the work to be performed Use of the p...

Страница 5: ... important task a user Periodically depends on the working condition and circumstance for maintaining a good function the user has to check the grounding condition every 3 6 months by an electric meter and following simple steps Set the Ohm meter to level R 100 Ohm Touching 2 test rods together and reset the meter to 0 Using the Red rod to touch the Grounding wire on the Plug of controller s cord ...

Страница 6: ...er tip and it will be unlocked Thus the bit can be freely attached and detached single finger notion type select such a bit whose shank is equal to the size shown below Insert the power plug into a receptacle and set the changeover switch to F position Apply the bit to the screw head and press the lever or push main body to then the switch will be turned ON to start the motor running When the scre...

Страница 7: ... center 3 KILEWS is not responsible for customer modification of tools for applications on which KILEWS was not consulted 4 Repairs should by made only by authorized trained personnel Consult your nearest KILEWS authorized service center 5 It is the responsibility of the employer to place the information in this manual into the hands of the operator DO NOT ATTEMPT TO REPAIR THIS ELECTRIC SCREW DRI...

Страница 8: ...2 6 4 0 2 6 4 0 2 6 4 0 4 0 5 0 4 0 5 0 Tapping screw 2 6 3 5 2 6 3 5 2 6 3 5 2 6 3 5 4 4 Weight g 820 Length mm 294 Model of Torque Fixing Ring KC 7 Power controller SKP 40B Model of Suspension Rack KH 2 Bit Type HEX 5mm HEX 6 35mm HEX 6 35mm 1N m 10 2Kgf cm 1N m 8 85Lbf in 1 BIT Type No 00 Bit use in dia 1 3 1 8mm screw No 0 Bit use in dia 1 8 2 0mm screw No 1 Bit use in dia 2 0 2 6mm screw No 2...

Страница 9: ...utomatic learning LED keeps flash of light Buzzer En Wrong Set Up Wrong Set Up such as Lt Ht Three buzz and LED red flash Automatically show En Buzzer dt Standby Tme Seconds To stop fastening as set number screws are not completed Lasting buzz s and LED red flash tt Working time 00 99 The setting number of screws which are not finished fastening within the setting time Continual buzzer sound and r...

Страница 10: ...ition ON Fasting a screw completing work and mistaken operation buzzer will be on OFF Wrong operation will be buzzed FF Work completed and wrong operation will cause buzz EF As one screw is fastened and work is completed buzzer will be on as mistake made has buzz Ht Lt mainly set up the period of time If stop is within the set period it means OK In contras it will be NG as stop before Lt or after ...

Страница 11: ...4 Adjust the bit torque by changing the driving in length of the adjust ring at the end 5 The relationship between torque scale and bit torque is as shown Ring in the torque diagram The figures of torque scale do not indicate bit torque values However the clamping torque of screw itself is different form type size material of the screw and the material of its mating part Use it as standard to obta...

Страница 12: ...ll get worn faster The new screwdriver uses in the scale of 4 for one month frequency 12 pcs min 8 hours per day will result in 3 5 torque decay Scale of 8 will result in 5 7 torque decay By the growth in use of time the torque decay level will gradually reduce and stabilize User could test the torque output of the screwdriver by torque meter periodically and then adjust it to meet user s requirem...

Страница 13: ...CUSTOMER ITEM NO TITLE DWG NAME DWG NO MATERIAL DES BY CHKD BY APPD BY SHRINK DATE DATE DATE PRODUCTION NO THIRD ANGLE PROJECTION UNIT SCALE SHT NO OF SHTS SKD BE850P SKD BE830P ...

Страница 14: ... 2 SHAFT FOR PB TYPE 傳動軸 B TYPE 1 13 EG31419 4F PCB 計數機板成品 1 GD91402A SHAFT FOR PA TYPE 傳動軸 A TYPE 1 14 CH90156 SCREW 螺絲 2 45 GP21291A STEEL BALLS FOR PA TYPE 3ψ 起子頭帽鋼珠 PA 3ψ 2 15 W50114 PC BOARD GAP COLUMN PC板間隔柱 2 GP21291B STEEL BALLS FOR PB TYPE 2 5ψ 起子頭帽鋼珠 PB 2 5ψ 2 16 EG31419 5 PCB 驅動機板成品 1 46 GY21321 WARING SPRING BASE 止推盤 1 17 C50213 BOTTOM 矽膠按鍵 1 47 GB30443 1 CLUTCH CASE A SSY 下離合器筒半成品 1 1...

Отзывы: