PAT-T 4kW
A-21
Appx
Measurement (Sequence 3: ACQuire)
The PAT has the capability to return voltage and current measurement values. The
easiest way is use the MEASure commands. The trigger function is not used.
The MEASure commands immediately start a new measurement. Simultaneity for
multi-item measurements are lost, because each MEASure command starts a new
measurement. Advanced measurement allows separate control for measurement
initiation and data query.
To measure the voltage and current, use the following queries.
:MEASure:VOLTage? '
Q
u
ery the voltage o
u
tp
u
t
:MEASure:CURRent? '
Q
u
ery the c
u
rrent o
u
tp
u
t
The PAT also supports the READ command that initiates a new measurement and
queries the data. READ and MEASure are aliases; they operate exactly the same.
Advanced Measurement
The TRIGger:SEQuence3 (or TRIGger:ACQuire) subsystem allows you to control
the start of the measurement and the data query separately.
To start a new measurement, set the trigger source to IMMediate and use the
INITiate command.
:TRIGger:SEQuence3:SOURce IMMediate
'
Set the trigger so
u
rce to IMM
:INITiate:SEQuence3 '
Initiate seq
u
ence 3
If you want the measurement of the sequence3 group to start on a software trigger,
change the trigger source to BUS.
:TRIGger:SEQuence3:SOURce BUS
'
Set the trigger so
u
rce to BUS
:INITiate:IMMediate:SEQuence3
'
Initiate seq
u
ence 3
:TRIGger:SEQuence3:IMMediate
'
Apply a soft
w
are trigger to seq
u
ence 3
When the measurement is completed, measurement data can be queried with the
FETCh query commands.
:FETCh:VOLTage? '
Q
u
ery the voltage o
u
tp
u
t
:FETCh:CURRent? '
Q
u
ery the c
u
rrent o
u
tp
u
t
The TRIGger:SEQuence3:SOURce command sets the trigger source to BUS or
IMMediate. The INITiate:SEQuence3 command makes the trigger subsystem leave
the IDLE state and go the initiated state. If the trigger source is set to IMMediate,
the measurement starts immediately. When the Trigger Source is set to BUS, the
Содержание PAT160-25T
Страница 17: ...General Description This chapter describes an overview and describes the features...
Страница 22: ...1 6 PAT T 4kW...
Страница 34: ...2 12 PAT T 4kW...
Страница 73: ...External Control This chapter describes external analog control and remote monitoring using the J1 connector...
Страница 106: ...6 12 PAT T 4kW...
Страница 158: ...7 52 PAT T 4KW...
Страница 159: ...Maintenance This chapter describes maintenance such as cleaning inspecting and calibrating...
Страница 171: ...Specifications This chapter describes the specifications and gives the dimensions of the PAT...