TRAMPOLINE ASSEMBLY INSTRUCTION 

BAT 1 

Jūrmalas Mežaparki, Ltd. 

1 Garkalnes street 

Jurmala, LV 2011, Latvia 

Содержание BAT1

Страница 1: ...TRAMPOLINE ASSEMBLY INSTRUCTION BAT 1 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala LV 2011 Latvia ...

Страница 2: ...da Liene Pavlova 2 8 1 Tape measure 3 m 2 Spade 3 Leveler Overview 1 WARNINGS A safety zone must be maintained 1 500 mm around any playground equipment This area must be clear from any objects trees buildings fences rocks curbs pools etc Children under the age of 5 years to be the only person responsible for supervision RECOMMENDED AGE from 5 years MAX HEIGHT OF HALL 0 50 m MAX RECOMMEMDED CAPACIT...

Страница 3: ... PLAYGROUND and GYMNASTIC COMPLEX Page Pages BAT 1 drawings Date 26 11 2014 Version Nr Developed by Name Surname Signature Approved by Andris Čuda Liene Pavlova 2 8 Part BAT 1 Trampoline 1 ADDITIONAL ELEMENTS 00 Marking 1 PE1 Assembly part 1 Quantity Specification 2 ...

Страница 4: ...ge Pages BAT 1 drawings Date 26 11 2014 Version Nr Developed by Name Surname Signature Approved by Andris Čuda Liene Pavlova 2 8 1 500 1 500 1 500 1 500 2 000 5 000 2 500 5 500 1 500 2 000 0 000 0 040 0 490 0 790 1 400 Base Breakstone fr 20 40 mm Thickness 300 mm Required safety area for the complex 3 ...

Страница 5: ...Jurmala CHILDREN PLAYGROUND and GYMNASTIC COMPLEX Page Pages BAT 1 drawings Date 26 11 2014 Version Nr Developed by Name Surname Signature Approved by Andris Čuda Liene Pavlova 2 8 00 Quantity 1 pcs PE1 Quantity 1 pcs Additional parts specification 4 ...

Страница 6: ...A A 0 000 0 040 0 490 0 790 1 400 Base Breakstone fr 20 40 mm Thickness 300 mm Assembly step 1 5 Comment 1 No concrete works required therefore no mutiple deliveries and setting times 2 The First must be dig a air pit for the trampoline stainless steel panel frame size Length x Width 2 500 x 2 000 mm with depth 790 mm 3 The Second insert a breakstone as a MAX 300 mm depth 4 The Third a trampoline ...

Страница 7: ...nance 6 Assembly 3 h RECOMMENDED CAPACITY for assembling and maintenance MIN 2 people Comments 1 It is necessary two people during installation and maintenance 2 The first step of assembly plastic wicker work two sides must be secured in the spirals 2 Then the first man must inserted the hook in to the spring and pulled on his side 3 Meanwhile the second man pushing a spiral with hook down suspend...

Страница 8: ...aintenance 7 Assembly 3 h RECOMMENDED CAPACITY for assembling and maintenance MIN 2 people Comments 1 It is necessary two people during installation and maintenance 2 The first step of assembly plastic wicker work two sides must be secured in the spirals 2 Then the first man must inserted the hook in to the spring and pulled on his side 3 Meanwhile the second man pushing a spiral with hook down su...

Страница 9: ...nance MIN 2 people Comments 1 It is necessary two people during installation and maintenance 2 To unhook the plastic wicker work from spirals is necessary use a additional element PE 1 hook 2 The first man must inserted the hook in to the spring and pulled on his side 3 Meanwhile the second man pushing a spiral with hook down must be unhooked a metal mesh section from spiral 4 It is necessary main...

Отзывы: