
59
Step 24: Door Wall Assembly
Part 1
A:
Tight to the bottom of (2124) Front Floor and flush to the outside edge of (2153) Post attach (2115)
Chalkwall Top to both (2153) Posts and both (2154) Front Posts with 6 (S7) #12 x 2” Pan Screws, as shown
in fig. 24.1 and 24.2.
Hardware
Wood Parts
6 x
#12 x 2” Pan Screw
S7
1 x
Chalkwall Top 5/4 x 4 x 52”
2115
2124
Fig. 24.2
Fig. 24.1
S7
S7
S7
2115
2153
2154
Tight
Flush
2153
Front Wall
Содержание ASHBERRY
Страница 72: ...72 NOTES ...
Страница 73: ...73 NOTES ...
Страница 74: ...74 NOTES ...
Страница 75: ...75 NOTES ...