background image

2

1330 Bellevue Street • P.O. Box 8100 • Green Bay, WI  54308-8100 • Tel 1-800-424-2432 • www.ki.com

© 2019 Krueger International, Inc. All Rights Reserved • Code KI-AI-000049/KI/PDF/0719

Assemble units as described herein only. To do otherwise 
may result in instability. All screws, nuts and bolts must be  
tightened securely and must be checked periodically after  
assembly. Failure to assemble properly, or to secure parts 
may result in assembly failure and personal injury.

10.  Orient the tote as illustrated and 

insert the top, side rim of the 

tote into the installed slide rail as 

illustrated. While supporting the 

tote up under the tabletop, slide the 

second slide rail onto the opposite 

side of the tote. Position the slide 

rail tight to the side of the tote, 

then mark the three mounting slots 

to the bottom of the table for the 

second, right-hand slide rail to be 

installed. Make sure the front, “user 

side” marked location is 1

1

/

8

” back 

from the front, “user side” of the 

tabletop. Move the bracket away 

and set aside (Figure 3). 

Important:

 To allow for the tote to 

slide more freely, drilling of pilot 

holes for the second slide rail must 

be performed differently than the 

first. Drilling of holes must be done 

at the outside of the marked slots 

under the tabletop, not in the center 

of the slots. 

11.  Check that the first set and second 

set of three marked mounting 

slots are parallel to the first and 

are 14” apart. Using a power drill, 

carefully drill a 

1

/

8

” pilot hole under 

the tabletop at the outside of each 

slot. Take care to not drill too 

deep, piercing through the tabletop 

(Figure 3). 

12.  Position the second slide rail 

unit straight under the tabletop, 

centering the mounting holes over 

the pilot holes and secure using 

three #10 x 

1

/

2

” Phillips screws. 

Take care to not over-tighten 

(Figure 4). 

13.  Insert the top side rims of the tote 

into the installed pair of slide rails 

and slide into place (Figure 5).

tote

Figure 5

slide rails

Figure 3

marked

pilot hole

tote

right-hand

slide rail

tabletop

Figure 4

pilot

holes

right-hand

slide rail

#10 x  / ”

phillips

screws

1

2

Ruckus

®

 Tote Storage - Undersurface Rail Kit

Assembly Instructions

Part# 2.80713

Отзывы: