Operating & Maintenance
Dry Well Submersible Pump Set
13). Maintenance
On each service we would carry out the following:
➢
Visual Inspection of the pumps.
➢
Top up the oil levels where necessary.
➢
Test the pump motors.
➢
Clean and check the operation of the electrodes, non-return and gate valves and all
associated electrical connections.
➢
Test all electrical controls.
➢
Following each visit, we would send a separate report of our findings, together with an
invoice for the service.
➢
Any minor faults found during the service visit would be rectified at the time following verbal
instruction, although should we pick up on any more major faults, you would be notified in
writing and the work would be carried out and invoiced separately on receipt of an order from
yourselves.
The unit is constructed using low maintenance components throughout and should not require
any day to day maintenance.
The following is the recommended frequency for various maintenance tasks.
➢
Other items, such as security of fixings, terminations, plant room mechanisms and
accessories are not specified, but should be carried out as a matter of course, as on any
other piece of equipment.
We suggest that routine maintenance visits are carried out on a
twice yearly basis by a KGN engineer.