background image

Содержание 100H

Страница 1: ...LER 100H 200H 300H 400H 520H 200HC 300HC 400HC 500HC INSTRUCTIONMANUAL Thanks for your purchase of our impuse sealers To obtain the benefit from our products Please read the following instruction before operation ...

Страница 2: ...the supply circuit before servicing the replacement of the heating element 1 HEATING ADJUSTMENT LIST enrlt trOlClfOR POLYETHYLENE POLYPROPYLENE OR HIGH HEATFILiI UNDER 006m m 2 UNDER0 1m m 3 UNDER 0 14m m 4 UNDER 0 2mlm UNDER 0 03m m q UNDER 0 044m m 6 UNDER 0 06m m 7 UNDER OOBm m ...

Страница 3: ...DEGREE PUTA POLY BAG ONTHEHEATING ELEMENT OFTHISMACHINE THENPRESS DOWNHANDLE KNOBAFTER1 2SECONDS THE PERFECT SEALAPPEAR SLIDE THEKNIFE COVER FINISHED cuTTlNG 200HC 300HC 400HC IFTHESEALING APPREARANCE IS BREAK OR DAMAGE PLEASE REGULATE TIMERKNOB TOWARD THE S SIDEANDTRYAGAIN TILLTHEPERFECT SEALAPPEAR IF THESEALING APPEARANCE ISNON FULL WELD PLEASE REGULATE TIMERKNOBTOWARD THE L SIDEANDTRYAGAIN TILL...

Страница 4: ...CLOTH IF THEYARE UNUSUAL REPLACE IT ATONCE BECAUSE THE WORN HEATER INSULATED CLOTHAND UPPERCLOTHWILLMAKE ELECTRIC SHORTWAY ALSOWILL DAMAGETO HEATING ELEMENT WHILEREPLACED HEATING ELEMENTMUSTBE SAME SIZEAS ORIGINAL WHILESEALING APPEARANCE IS NOTENOUGHEXCELLENT SHOULDREPLACE SEALING SILICON RUBBER DON TSTRIKE POWERFULLY OTHERWISE THE BREAKDOWN WILLHAPPEN WHENUSEEXCESSIVE THETEMPERATURE TOO HIGH SUSP...

Страница 5: ...DPLATE REPLACE WITHA NEW TEFLONCLOTH SECURETHE FIXEDPLATE WITHSCREWS WHENCHANGING THE HEATER REMOVE THETEFLON CLOTH ANDUNSCREW THE HEATER PLACE ONE ENDOF THEHEATER ON THEELECTRODE ANDSECURE THE OTHERENDWITHSCBEWS THENSCREWON THE TEFLONCLOTH ELECTRODE TELFLONCLOTH SCREW HEATER FIXED PLATE SCREW ...

Страница 6: ...EATING WIRE DISCONNECTED ELECTRODE SPRING REPLACETHE ELECTRODE WIREOR CHECKVOLTAGE PILOTLAMPSTILL ON ANDTHETEFLON CLOTHOVERHEATS TTMER MALFUNCTION CONTACT YOURSUPPLIER OPROLONGED HEATING TIME DECREASE THEHEATING TIME HEATING WIRE BROKENSUDDENLY OTOO FREQUENT OPERATION NEEDAPPROPRIATE COOLINGPERIOD KEEPAT LEASTI SECOND AFTERTHE LED LAMPOFF THENPUSHTHE HANDLE DAILYOPERATION SHOULD NOTEXCEED1 OOO TIM...

Страница 7: ...IMPERFECT l FRACTURED TEFLONCLOTHl REpLnCeTHETEFLON CLOTH KEEPAT LEAST1 SECOND COOLING TIME l I il CONNECTION DIAGRAM MICROSWITCH AC SOURCE TRANSFORMER 6 TIMERSET HEATING ELEMENT ...

Страница 8: ...F 1ooH 2OoH 3OOH 4OoH 52ofl PARTS DIAGRAM 7 ...

Страница 9: ...RACKET SPRTNG HINGEBRACKET 15 POWERCORD 4 COILSPRING 16 HEAIINGELEMENT PIN 6 MICROSWITCH BRACKET 17 MIUHO SWITCH SEALING PLATED 18 TRANSFORMER OUT PI JN TFFII i INA SEALING SILICONRUBBER 1 9 I HANSFORMER I UPPERCLOTH 20 I II tsLhMENT 21 TRANSFORMER SUPPORTOR RUBBER FOOT 10 FIXEDPLATE 22 l 1 TIMERSET 23 12 WIRECONNECTOR 8 ...

Страница 10: ...2o0HC sooHc 400HC PARTS DIAGRAM ...

Страница 11: ...RE NUT WASHER 41 SEALING BAR RETURN SPRING SCREW SPRING WASHER 24 BASE PI ATE 42 SILICON RUBBER SEALING PAD B PI ASTIC WASHER 25 EARTH WIRE SCREW 43 HANDLE KNOB o HINGE BRACKET 26 BUSHING 44 HANDLE KNOB WASHER 1 0 SCREW POWER CORD A F BI ADE HOLDER 1 1 AFi 28 RUBBER FOOT 46 CUTTER BI ADE 12 ARM OPEMTING BMCKET 29 RUBBER FOOTSCRM 47 BLADE FIXED PLATE I ICROSWITCH ADJUSTING SCREW30 LOWER IEFLON ADHE...

Страница 12: ...SPAREPARS TEFLON GLOTHx2 PIECES ...

Отзывы: