background image

Figure 2C

Figure 2D

Figure 2E

FIGURE 2C. INSTALL BRACE

1.

Locate BRACE and prepare to install between BEAM and POST.

2. Position BRACE with square cut end pointing up and the opposite end 

(has “mouse hole” cutout) facing toward post. 

3. Push square cut end of BRACE firmly into socket in center underside of BEAM.

4. Install 5/16 – 18x1” long bolt through access “mouse hole” and firmly 

tighten to secure BRACE against post.

FIGURE 2D. INSTALL MAILBOX

1. Lift MAILBOX onto tray portion of the BEAM.

2. With MAILBOX pointing in desired direction, align the four mounting holes 

in the floor of the MAILBOX with corresponding holes in tray portion of 
the BEAM.

3. Install 4 pcs. 1/4” - 20x1” bolts from the inside of the MAILBOX out.

4. Turn 1/4” - 20x1” nuts onto exposed ends of bolts and tighten securely.

FIGURE 2E. ATTACH BALL FINIAL TO TOP OF THE POST 

1. Square base of Ball Finial will press fit into the open square top end of the post.

2. If desired, a clear, exterior, silicone adhesive (available at hardware store) 

may be applied to the walls of the square base of BALL FINIAL before 
inserting into the end of the post.

You have successfully completed the installation of the Gaines Keystone
Mailbox and post. You will enjoy many years of service from this product.

CUSTOMERS ARE REQUESTED TO CONTACT THE LOCAL POST OFFICE BEFORE ERECT-
ING THE BOX TO ENSURE ITS CORRECT PLACEMENT AND HEIGHT AT THE STREET.

Отзывы: